My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A non-structural steel special inspection final report-2015
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2730 Kelley Parkway - 33-118-23-12-0007
>
Misc
>
A non-structural steel special inspection final report-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:43 PM
Creation date
3/28/2017 11:58:14 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> s Rau N <br /> INTERTEC <br /> Speciat Inspection Daily Report <br /> City of Orono Page: 1 of 1 <br /> Report No.: #2 Date: September 2,2014 <br /> Projecf Name: Orono Police Dept.Expansion Project No.: B14-05902 <br /> Projecf Addreu: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN <br /> Clienf: City of Orono Clie�Project No.: <br /> Weather. Partly Cloudy Temperafure: 65°F <br /> Type of Inspection: Inspection Coverage: <br /> ❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑Special Cases <br /> � Periodic ❑ Welding&Bolting ❑Concrete ❑ Fireproofing <br /> ❑ Piles& Piers ❑Tendon Placement �Soils <br /> Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No � <br /> Descripfion and locaflon of wo�lc completed: <br /> -Observed the soils in the bottom excavation on the east end of the addition. Performed hand auger probes in the <br /> bottom of the excavation. The soiis consisted of gray sandy lean ciay.The soils appeared to be suitable for the designed <br /> footing beqring pressure of 2000 psf. <br /> -The elevation at the bottom of the excavation ranged from 1014'to 1016 1/2'. <br /> -Performed 3 compaction tests on fill placed in the building pad. One of the three compaction tests failed to meet <br /> project specifications of 989b compaction. Nofrfied the contractor of the failing test. <br /> List tesis performed: I <br /> . Are there any discrepancies noted from this days observations� Yes ❑ No � <br /> . Are there any outstanding discrepancies on this project� Yes ❑ No � <br /> . If yes,see attached Summary Sheet. <br /> . Report Discussed with and Given to Contractor: Yes � No ❑ <br /> Report EmaAed to: <br /> Ja�k <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> ��:��,�-�= Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> Prrouiding engineering and environmental solutions since i957 <br />
The URL can be used to link to this page
Your browser does not support the video tag.