Laserfiche WebLink
Page 1 of 1 <br /> eRauN <br /> INTERTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 ot t <br /> Report No.: #1 Dafe: August 1 S,2014 <br /> Project Name: Orono Police Dept. Expansion ProJecf No.: 614-05902 <br /> Project Address: 2730 Kelly Pkwy. Broun Infertec PM: MARK FLYNN <br /> CIIeM: City of Orono Client Project No.: <br /> Weather: Partly Cloudy Temperafure: 55°F <br /> Type of Inspection: Inspedion Coverage: <br /> ❑Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑5pecial Cases <br /> � Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing <br /> ❑ Piles&Piers ❑Tendon Placement �Soils <br /> Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No � <br /> DescripHo�and IocaHon of work completed: <br /> -Observed the soils in the bottom of test pits excavated in the area of the new addition. <br /> List tests perfortned: <br /> . Are there any discrepancies noted from this day's observations� Yes ❑ No � <br /> • Are there any outstanding discrepancies on this project2 Yes ❑ No � <br /> . If yes,see attached Summary Sheet. <br /> • Report Discussed with and Given to Contractor: Yes � No ❑ <br /> Report Emailed to: <br /> Jack <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> / <br /> ,-�%���,�% Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> _.____.__ i <br /> I <br /> -Prouiding engineering and enuironmental solurions since i957 <br />