Laserfiche WebLink
I Page 1 of 1 <br /> s Rau N <br /> INTERTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 of 1 <br /> Report No.: #25 Date: October 10,2014 <br /> Project Name: Orono Police Dept.Expansion Project No: 614-05902 <br /> Projecf Address: 2730 Kelly Pkwy. 8raun Intertec PM: MARK FLYNN <br /> Clie►�t: Ci1y of Orono Cllent ProJect No.: <br /> Weather. Partly Cloudy Temperafure: 50°F <br /> Type of Inspection: Inspection Coverage: <br /> ❑Continuous ❑Masonry � Rebar Placement ❑ Foundations ❑Special Cases <br /> � Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing <br /> ❑ Piles&Piers ❑Tendon Placement ❑Soils <br /> Did the architect or engineer authorize changes to approved plans2 Yes❑ (Listed Below) No � <br /> Descripfion and location of work complet�d: <br /> -Observed the plqcement of rebar for interior slab on grade @ Grid A to E from 1 to 6. <br /> -Picked up grout samples cast on 10-9-14. <br /> I <br /> Llst tests performad: <br /> I <br /> • Are there any discrepancies noted from this day's observations� Yes ❑ No � <br /> • Are there any outstanding discrepancfes on this project� Yes ❑ No � <br /> • If yes,see attached Summary Sheet. <br /> • Report Discussed with and Given to Contractor: Yes � No ❑ <br /> Report Emailed to: <br /> Jack Bronc.ryk jar:k.broncrykCg-krausanderson.com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,speclfications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> -�;%� Loosbrock, Tom <br /> L?h /�/,/� <br /> I.D.No.: 1 136593 <br /> Prouiding engineering and ettuironmental solutions since 1957 <br />