My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A non-structural steel special inspection final report-2015
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2730 Kelley Parkway - 33-118-23-12-0007
>
Misc
>
A non-structural steel special inspection final report-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:43 PM
Creation date
3/28/2017 11:58:14 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page t of 1 <br /> s Rau N <br /> I NTE RTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 of 1 <br /> Report No.: #24 Date: October 9,2014 <br /> Project Namo: Orono Police Dept.Expansion Project No.: B14-05902 <br /> ProJed Address: 2730 Kelly Pkwy. Braun Inter#ec PM: MARK FLYNN <br /> Clienf: City of Orono Client Project No.: <br /> Weathsr: Partly Cioudy Temperature: 50�F <br /> Type of Inspection: Inspection Coverage: <br /> ❑ Continuous �Masonry � Rebar Placement ❑ Foundations ❑Special Cases <br /> ❑ Periodic ❑Welding&Bolting ❑ Concrete ❑ Fireproofing <br /> ❑ Piles&Piers ❑Tendon Placement ❑Soils <br /> Did the architect or engineer authorize changes to approved plansZ Yes❑ (Listed Below) No � <br /> Doscrfptlon and IocaFbn of work complefed: <br /> -Observed the placement of rebar and gro�t for a masonry wall�Grid B.2-6 to C.2-6 at elevation 109'. <br /> -Sampled and tested the grout for slump and cast 1 set of 3 grout prisms(Set#1). j <br /> list fests pe�formed: <br /> Grout Set#1 =8 3/4" <br /> . Are there any discrepancies noted from this day's observationsZ Yes ❑ No � <br /> • Are there any outstanding discrepancies on this projectZ Yes ❑ No � <br /> • If yes,see attached Summary Sheet. <br /> . Report Discussed with and Given to Coniractor: Yes � No ❑ <br /> Report Emalled to: <br /> Jaek Rronc,ryk jack.broncrykC`krousanderson.com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable workmanship provis'rons of the current IBC,except as noted above. <br /> ���I <br /> �-= Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> Prouiding engineering and environmental solutions since 19� <br />
The URL can be used to link to this page
Your browser does not support the video tag.