Laserfiche WebLink
Page 1 of 1 <br /> s Rau N <br /> INTERTEC <br /> Special Inspection Daily Report <br /> CItY Of OI'On0 Page: 1 of 1 <br /> Report No.: #16 Date: September 23,2014 <br /> Project Name: Orono Police Dept.Expansion Project No.: B14-05902 <br /> Project Address: 2730 Kelly Pkwy. Braun Infertec PM: MARK FLYNN <br /> Clier�t: City of Orono Client ProJact No.: <br /> Weafher. Partly Cloudy Temperature: 70°F <br /> Type of Inspection: Inspectfon Coverage: <br /> ❑Continuous ❑ Masonry � Rebar Placement ❑ Foundations ❑ Special Cases <br /> ❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing <br /> ❑ Piles&Piers ❑Tendon Placement ❑Soils <br /> Did the architect ot engineer authorize changes to approved plans� Yes❑ (Listed Below) No � <br /> Dascription and location of work completed: <br /> -Observed the placement of rebar for Wall�Grid A-2 to D-2 to D-2.2 and Footings Q Grid C to D from 1 to 2. <br /> -Observed the placement of concrete for the footings and wall at the grids listed above. Sampled and tested the <br /> concrete for slump,air content and temperature. Cast i set of S-4x8 cylinder(Set#i 1). <br /> List tests arformed: <br /> P <br /> Set#11 =Slump:4",Air Content:5.3�0,Concrete Temperature:73F,Sample#47135 <br /> • Are there any discrepancies noted from this days observations� Yes ❑ No � <br /> • Are there any outstanding discreppncies on this project2 Yes � No � <br /> . If yes,see attached Summary Sheet. <br /> • Report Discussed with and Given to Contractor: Yes � No ❑ <br /> Report Emalled to: <br /> Jack Bronczyk jack.broncryk�krnusanderson.com <br /> To the best of our knowledge,work inspected was done in accordance with the app�oved plans,specifications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> �.��� <br /> ,z,��--r� Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> I <br /> Prouiding engineering and environmental solutions since 1957 <br />