Laserfiche WebLink
Page t of 1 <br /> BRauN <br /> INTERTEC <br /> Special Inspection Daily Report <br /> Clty Of OP0110 Page: 1 of 1 <br /> Repafi No.: #15 Date: September 22,2014 <br /> Project Name: Orono Police Dept.Expansion ProJect No.: 814-05902 <br /> Project Address: 2730 Kelly Pkwy. Braun Interfec PM: MARK FLYNN <br /> Cflent City of Orono CUeM Project No.: <br /> Weath�r. Partly Cloudy T�mporaturo: 70°F <br /> Type of Inspection: Inspedion Coverage: <br /> ❑ Continuous ❑ Masonry � Rebar Placement ❑ Foundations ❑Special Cases <br /> ❑ Periodic ❑Welding&Bolting � Concrete ❑ Fireproofing <br /> ❑ Piles 8�Piers ❑Tendon Placement ❑Soils <br /> Did the architect or engineer author'¢e changes to approved plans8 Yes❑ �listed Below) No � <br /> Dos�rlpNon and location of work compl�fod: <br /> -Observed the placement of rebar for Wall C�Grid 6.2-6.2 to 8.2-6.3 to B.9-6.3 to 6.9-6.4. <br /> -Observed the placement of concrete forwall at the grids listed above. Sampled and tested the concrete for slump,air <br /> content and temperature. Cast 1 set of 5-4x8 cylinder(Set#10). <br /> List tasts performad: <br /> Set#10=Slump:3",Air Content:5.19'0,Concrete Temperature:78F,Sample#46955 <br /> • Are there any discrepancies noted from ihis day's observations? Yes ❑ No � <br /> . Are there any outstanding discrepancies on this project2 Yes � No � <br /> . If yes,see attached Summary Sheet. <br /> . Report Discussed with and Given to Contractor: Yes � No ❑ <br /> Repo�t Emailed to: <br /> Jack Bronczyk-jack.broncryk@krausqnderson.com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> �%��'�-� Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> Prouiding engineering and enuironmental solutions since 19� <br />