Laserfiche WebLink
Page 1 of 1 <br /> sRauw <br /> I NTE RTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 of 1 <br /> Reporf No.: #5 Date: September 5,2014 <br /> Project Name: Orono Police Dept.Expansion Projecf No.: B14-05902 i <br /> Project Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN <br /> Clisr�t: City of Orono Client Project No.: <br /> Woafher: Parfiy Cloudy Temperature: 65°F <br /> Type of Inspection: Inspection Coverage: <br /> ❑Continuous ❑Masonry ❑ Rebar Placement ❑ Foundations ❑Special Cases <br /> � Periodic ❑Wel�ng&Bolting ❑Concrete ❑ Fireproofing <br /> ❑ Piles& Piers ❑Tendon Placement �Soils <br /> Did the architect or engineer authorize changes to approved plans? Yes❑ (Listed Below) No � <br /> DescripHon and localion of work compleled: <br /> -Observed the soils in the bottom excavation for new addition. Performed hand auger probes in the bottom of the <br /> excavation. The soils consisted of gray sandy lean clay.The soils appeared to be suitable for the designed footing <br /> bearing pressure of 2000 psf. <br /> -The elevation at the bottom of the excavation ranged from 1014'to 1016'. <br /> -Performed 14 compaction tests on fill placed in the building pad. The tests met project specifications of 989 <br /> compaction. <br /> List tQsts performed: <br /> I <br /> . Are there any discrepancies noted from this day's observationsZ Yes ❑ No � <br /> • Are there any outstanding discrepancies on this projectZ Yes ❑ No � <br /> • If yes,see attached 5ummary Sheet. <br /> . Report Discussed with and Given to Contractor: Yes ❑ No ❑ <br /> Report Emalled to: <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> ���% <br /> .�,,_-- Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> -Prouiding engineering and enuironmental solutions since 19� <br />