Laserfiche WebLink
Page 1 of 1 <br /> s Rau w <br /> I NTE RTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 oF � <br /> Report No.: #4 Date: September 4,2014 <br /> ProJect Name: Orono Police Dept.Expansion Project No.: B14-05902 <br /> Projecf Address: 2730 Kelly Pkwy. Braun Infertec PM: MARK FLYNN <br /> CIIeM: City of Orono Clie�Project No.: <br /> Weath�r. Partly Cloudy Temperafura: 65°f <br /> Type of Inspedion: lnspedion Coverage: <br /> ❑Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑Special Cases <br /> � Periodic ❑Welding 8�Bolting ❑Concrete ❑ Fireproofing <br /> ❑ Piles&Piers ❑Tendon Placement �Soils <br /> Did the architect or engineer authorrze changes to approved plans8 Yes❑ (Listed Below) No � <br /> Description and IocaHon of wo�lc complsted: <br /> -Observed the soils in the bottom excavation on the east end of the addition. Performed hand auger probes in the <br /> bottom of the excavation. The soils consisted of gray sandy lean clay.The soils appeared to be suitable for the designed <br /> footing bearing pressure of 2000 psf. <br /> -The elevation at the bottom of the excavation ranged from 1014'to 1016 1/2'. <br /> -Performed 4 compaction tests on fill placed in the building pad. The tests met project specifications of 98% <br /> compaction. <br /> List tests performed: <br /> . Are there any discrepancies noted from this day's observations? Yes ❑ No � <br /> • Are there any outstanding discrepancies on this project2 Yes ❑ No � <br /> . If yes,see atiached Summary Sheet. <br /> . Report Discussed with and Given to Contractor: Yes ❑ No ❑ <br /> Report Emalled to: <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> I <br /> r.���,�.-= Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> I <br /> Providing engineering and environmental solutions since i957 <br />