My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specs for garage entrance canopy
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2700 Kelley Parkway- 33-118-23-12-0007 - Public works
>
Misc
>
Specs for garage entrance canopy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:46 PM
Creation date
3/28/2017 10:42:57 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � 2. Allowances for rofit, overhead and nonreimbursable cos <br /> P ts shall be computed as follows: <br /> � a. For the Contractor: <br /> � (1) A minimum of 5% up to a maximum of 15% (the actual rate dependent of the <br /> Contractor's performance and assumed risks as determined in the sole discretion of the <br /> Owner) of all reimbursable costs defined in clauses 11.3.3.1 a (1) through (12) above, and <br /> � (2) A rninimum of 3% up to a maximum of 7% (as determined at the sole reasonable <br /> discretion of the Owner) for the work of Subcontractors supervised by the Contractor as <br /> ' computed in accordance with clause 11.3.3. No fee will be allowed on Subcontractor <br /> work not supervised by the Contractor. <br /> , {3) For first, second, and other tier Subcontractors claiming compensation for changed <br /> work under clause 11.3.3.1(a) (12), their allowances shall be determined at the sole <br /> reasonable discretion of the Owner consistent with percentages in subclause (2) directly <br /> � above. <br /> (4) The Owner shall have the right to examine, inspect, copy and audit the books and <br /> � records of any�ontractor or Subcontractor making claim for reimbursement for costs and <br /> . allowances hereunder in order to verify the accuracy, correctness, completeness and <br /> , propriety of all costs and allowances claimed. <br /> - 11.4 CHANGE OF C011.T'�'I�ACT TIME <br /> � 11.40 l �'he Contract Time may only be changed by a Change Order. Any claim for an <br /> extension in the Contract Time shall be based on written notice delivered to Owner and <br /> � Engineer within ten (10) days of the occurrence of the event giving rise to the claim. Notice <br /> of the extent of the claim with supporting data shall be delivered within thirty (30) clays of <br /> such occurrence unless Engineer allows an additional geriod of tirne to ascertain more <br /> � accurate data. �II claims for adjustment in the Contract Time shall be determined by Engineer <br /> if Owner and Contractor cannot otherwise agree. Any change in the Contract Time resulting <br /> from any such claim shall be incorporated in a Change Order. <br /> � 1 l.4.2 The Coratract Time will be extended in an amount e ual to time lost due to dela s <br /> 9 y <br /> beyond the conYrol of�ontractor if a claim is made therefor as provid�d in paragrapl� 11.4.l. <br /> , Suctt de}ays shal� include, but not be limited to, acts or neglect by Owner, or to fires, floods, <br /> la�c,r�iispul�s, epide�ics, abnormal weather condition�, ar aci� af Gad. <br /> � 1�1.�.3 Fstl time lin�its �tat��in the Con�ract Docunlents ar� of the essence of the Agreernent. <br /> 'The provisions of this paragraph 11.4 shall not exclude recovery for damages (including <br /> � c6xnpensati�n for add�tional professional services) for delay by either party. <br /> i <br /> ��e.:era!/Specs/Conut�is.ye:. <br /> � «?1995 Bones[:no,Rosez�a <br /> �ir�dc;rliic Rr r�ssoeiates,Is!c. -45- <br />
The URL can be used to link to this page
Your browser does not support the video tag.