My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specs for garage entrance canopy
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2700 Kelley Parkway- 33-118-23-12-0007 - Public works
>
Misc
>
Specs for garage entrance canopy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:46 PM
Creation date
3/28/2017 10:42:57 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � <br /> In any and all claims against the Owner or the Engineer or any of their agents or employees by any <br /> employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of <br /> them or anyone for whose acts any of them may be liable,the indemnification obligation under this � <br /> Section shall not be limited in any way by any limitation on the amount or type of damages, <br /> compensation or benefits payable by or for the Contractor or any Subcontractor under worker's or � <br /> workmen's compensation acts, disability benefit acts or other employee benefit acts. <br /> SECTION 8 � <br /> MATERIALS. EOUIPMENT INSPECTION AND WORKMANSHIP <br /> 8.1 MATERIALS AND EOUIPMENT FURNISHED BY CONTRACTOR � <br /> 8.L 1 Contractor shall furnish all materials,equipment, labor,transportation,construction equipment �� <br /> and machinery, tools, appliances,fuel,power,light, heat,telephone, water and sanitary facilities and <br /> all other facilities and incidentals necessary for the execution, testing, initial operation and <br /> completion of the Work. � <br /> 8.1.2 All materials used in the Work sha11 be of good qua�ity, new unless otherwise provided for in � <br /> the Contract Documents, shall meet the requirements of the Specifications, and shall not be <br /> incorporated into the Work until reviewed by the Engineer. If required by Engineer,Contractor shall � <br /> furnish satisfactory evidence (including reports of required tests) as to the kind and quality of � <br /> materials and equipment. <br /> 8.1.3 All materials and equipment shall be applied, installed, connected, erected, used, cleaned and � <br /> conditioned in accordance with the instructions of the applicable manufacturer, fabricatar, supplier <br /> or distributor, except as otherwise provided in the Contract Documents. <br /> 8.2 EOUI�ALENT MATERIALS AND EQUIPMENT � <br /> Whenever tnaterials or equigment are specified or described in the Drawings or Specificatio�s b_y � <br /> using the name of a proprietary item or the name of a particular manufacturer, fabricator, supplier <br /> or distributor, the naming of the item is intended to establish the type, function and quality required. <br /> Unless the name is followed by words indicating that no substitution is permitted, materials or ,� <br /> equipment of other manufacturers,fabricators,suppliers or distributors may be accepted by Engineer <br /> if sufficient information is submitted by Contractor to allow Engineer to determine that the material � <br /> or equipment proposed is equivalent to that named. The procedure for review by Engineer will be <br /> as set forth in paragraphs 8.2.1 and 8.2.2 below as supplem�nted in the �General and Specific <br /> Requiremer.ts. � <br /> � <br /> � <br /> General/S pecs/Condtn s.gen <br />:� ;9�6 3onestroc�,,Rosene, � <br /> Anderlik&Associates,Inc. -2s- <br />
The URL can be used to link to this page
Your browser does not support the video tag.