My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specs for garage entrance canopy
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2700 Kelley Parkway- 33-118-23-12-0007 - Public works
>
Misc
>
Specs for garage entrance canopy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:46 PM
Creation date
3/28/2017 10:42:57 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> ' <br /> 7.3.5. The Owner's responsibility in respect of certain inspections, tests and approvals is set forth <br /> in paragraph 8.10.2. r <br /> 7.3.b. In connection with Owner's right to stop work or suspend work, see paragraphs 8.17 and 121. � <br /> Paragraph 12.2 deals with the Owner's right to terminate services of the Contractor under certain <br /> circumstances. <br /> 7.4 ASSIGNMENT OF CONTRACT � <br /> The Contractor shall neither sublet, sell, transfer, assign or otherwise dispose of the Contract or any � <br /> portion thereof, or of his right, title or interest therein, or his obligations thereunder, nor, if this <br /> Contractor is a corporate entity, sublet, sell, transfer or assign a majority of the outstanding shares <br /> of stock in the corporation, without prior written consent of the Owner. In case written consent is � <br /> given,the Contractor will be permitted to sublet a portion of the contract or corporate stock thereof, <br /> but shall perform,with his own organizadon,Work amounting to not less than 50 pereent of the total <br /> original contract price. No subcontracts or transfer of contract or corporate stock shall release the ' <br /> Contractor of his liability under the Contract or Bonds. <br /> 7.5 RIGHTS OF VARIOUS INTERESTS � <br /> Wherever Work being done by the Owner's forces or by other Contractors is contiguous to Work � <br /> covered by this Contract, the respective rights of the various interests involved shall be established <br /> by agreement to secure the completion of the various portions of the Work in general harmony. � <br /> 7.6 SEPARATE �CONTRACTS � <br /> The Owner may let other contracts in connectioti with the Work of the Contractor. The Contractor � <br /> shall cooperate with other Contractors with regard to storage of materials and execution of their <br /> Work. It shall be the Contractor's responsibility to inspect all work by other Contractors affecting <br /> his Work and to report to the Engineer any irregularities which will not pernut him to commence or � <br /> complete his work in a satisfactory manner. His failure to notify the Engineer of such irregularities <br /> shal] indicate the work of other Contractors has been satisfactorily compteted to receive his Woric. <br /> The Contractor shail not be responsible for defects of which he could not have known through � <br /> reasonable inspection thereof, which develop in the Work of others after the Work is completed. It <br /> shall be the responsibility of the Contractor to measure the completed work in place and report to <br /> the Engineer immediately any difference between completed work by others and the Drawings. � <br /> � <br /> � <br /> � <br /> GeneraUSpe�s/Condtns.�en <br /> �1996 Bonestroo,Rosene, � <br /> Ar.der}ik Rc Associates,lnc. - 22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.