Laserfiche WebLink
' <br /> ' <br /> 2.3 EXAMINATION OF PLANS, SPECIFICATIONS AND WORK SITE <br /> Each Bidder is required to examine carefully the site of the Work, the Proposal Forms, Specifications � <br /> and Plans. Submission of a Proposal constitutes a representation by the Bidder that he has rnade such <br /> exa�nination, has familiarized himself with the conditions to be encountered, the character, quality and � <br /> quantiry of wark to be performed and material to be furnished and ha� coi-related his observations with <br /> the requirements of these Contract Documents. <br /> 2.4 ADDENDA , <br /> Any Addenda issued prior lo tlle time of receipt of Yroposals shall be include�i in the Proposal and � <br /> shall be made part of the Contract Documents. Receipt oi'eacll Addendum shall be ack�lowledbe�l <br /> by the Bidder in his Proposal. <br /> 2.5 PREPARATION OF BIU ' <br /> The bidder shall submit his Proposal on the Proposal Form provided by the Owner. All blank spaccs � <br /> in the Proposal must be filled in clearly and correctly in ink or typewritten. Any interlineation, <br /> alteration or erasure must be initialed by the signer of the ProposaL The Proposal sl�all be signed in <br /> ink by the individual or authorized representative makin� the Proposal. � <br /> 2.6 RESEIZVATIONS AND/OR EXCEPTIONS <br /> Reservations or exce tions shall be clearl stated in wri � �> < • � <br /> p y tu1� and attached to tlle Prop<>sal. "ihey will <br /> be deemed to be a part of and incorporated into the Proposal. Bidders are advised that if sucl� <br /> reservations or exceptions constitute a substantial deviation from the advertised terms and conditions, r <br /> their Proposals may be rendered non-responsive. The Bidder shall make no ldditional sti��ulations <br /> on the Proposal nar qualify iT in any orher manner. � <br /> 2.7 BID SECURITY <br /> If so stipulated in the Advei-tisement for Bids, oi- Ini�ormation to Bidders, each Proposal shall bc � <br /> accompanied by a Bid Security in the required form and amount pled�ing that the Bidder will enter <br /> into a Contract with the Owner on the terms stated in his Proposal and will, ii'required, furnish bonds � <br /> as described hereunder in Section 6 covering the faithful performance of the Contract and the payment <br /> of all obligations arising thereunder. Should the Bidder refuse to enter into such Contract or fail to <br /> furnish such bonds, if required, the amount of the Bid Security shall be forfeited to the Owner as � <br /> liquidated damages, not as a penalty. The Owner will have the right to retain the Bid Security of <br /> Bidders until either(a)the Agreement has been executed and bonds, if required, have been furnished <br /> by the Contractor to whom an award has been made or (b) the specified time has elapsed so that � <br /> unaccepted Proposals may be withdrawn, or (c) all Propos�ls have been re_jecte�l. <br /> 1 <br /> ' <br /> GeneraVS��cs/Condtns.��cn <br /> C`1996 Bonesu��,Roscnc � <br />,andcrlik h�Ass��ciat<�s.[n.. -6- <br />