Laserfiche WebLink
' <br />' 1.12 DEFECTNE <br />� Refers to Work that is unsatisfactory, damaged, faulty or deficient, does not conform to the Contract <br /> Documents or does not meet the requirements of any inspection, test or approval referred to in the <br /> Contract Documents. <br />� 1.13 DRAWINGS <br />' The Drawings are all plans, drawings (including revisions thereto) or reproductions thereof issued <br /> by the Engineer pertaining to the Work provided for in the Contract Documents. <br />, 1.14 ENGINEER <br />� The Engineer is the person or entity or authorized representative thereof named in the Contract <br /> llocuments. <br />� 1.15 FIELD ORDER <br /> A written order issued by Engineer which orders minor changes in the Work in accordance with <br />, Paragraph 10.2, but which does not involve a change in the Contract Price or the Contract'I'ime. <br /> 1.16 FTNA�,C0IVIPL,]ETION <br />� - The�ork, incl�din an unch list items has been com leted in all �' <br /> g Y P � p respects in accardance w ith the <br />' Contract Docurnents. <br /> 1.17 MODIFICATION <br />' (a) A written amendmerat of the Contract Documents signed by both parties, (b) a Change Orci�r, or <br /> (c) a Field Order. <br />' 1.18 NOTICE OF AWARD <br />, The written notice by Owner to the apparent successfui Bidder stating that upon compliance by the <br /> apparent successful Bidder with the conditions precedent enumerated therein, within the time <br /> specified, Ow��er��vill sign and deliver the Agreement. <br />' 1.�9 NOTICF'�� �ROCEEl� <br />' A written notice given by Owner to Contractor(v�rith a copy to Engineer) fixing the date on which <br /> the Contract Time will commence to run and on which Contractor shall start to perform his <br /> obligatic�n under the Contract I3ocuments. <br />' <br />' <br /> <;erieraL SpecslCondtr s.ger� <br /> '�' "t=�96 Bos�estro�,Rosene, <br />' „�derii',:�F.�ca:��t�s. :a�_ _'2 <br />