Laserfiche WebLink
' <br /> 1.7 CONTRACT DOCUMENTS , <br /> The Contract Documents consist of the following, including all Addenda issued prior to the opening � <br /> of bids,Field Ordei�s, Change Ordcrs or other Modifications issued after execution of the Agreeinent: <br /> (a) Drawings. � <br /> (bj Specifications: <br /> 1 � � <br /> O Bid 1 ecumcnts (Advertis�ment, l�cldend�i, Infortnation to Bidclers, Proposal �izd Bid <br /> Security); � <br /> (2) Special Provisions; <br /> (3) General and Specific Requirements; � <br /> (4) Conditions of the Contract (General and otller conditions); � <br /> (5) Performance Bond and Labor and Materia] Payment Bond; <br /> (6) Form of Agreement; � <br /> (7) Detail Plates and other drawings attached to specifications; � <br /> 1.8 CONTRACT PRICE <br /> The moneys a able b Owner to Contractor under the Contract Documents as stated in the � <br /> PY Y <br /> Agreement. � <br /> 1.9 CONTRACTOR � <br /> The Contractor is the person or entity or authocired representative thereof i�a�ned in rhe Cc�ntract � <br /> Documents. <br /> 1.10 CHANGE ORDER , <br /> A written order to Contractor signed by Owner authorizing an addition, deletion or revision in thc � <br /> Work, or an adjustment in the Contract Priee or the Contract Time issued after the efPective date oi� <br /> the Agreement. <br /> 1.11 DAY ' <br /> A calendar day of twenty-faur hours u�easure:i fi�om rni�lnight to the next midnight. � <br /> , <br /> GcncrxUS�cs/Con�tns.ecn <br /> O 19)6 Buncslroo,Roscne. <br /> nndcrlik&Assucialcs.Ine. - ?- � <br />