My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project summary
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2706 Kelley Parkway (Antenna)
>
Misc
>
Project summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:51 AM
Creation date
3/27/2017 2:48:35 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 16000-ELEC1'ItICAL MATERIALS AND METHODS - <br /> A. PROJECT INCLUDES <br /> 1. Generally,the extent of electrical work is shown on the drawings and in the specificati ns. <br /> Include all labor,materials,tools,equipment,transportation,supervision and inciden items <br /> essential for proper installation and operation,even though not specifically mentioned r <br /> indicated on the drawings. <br /> 2. Give necessary notices,obtain permits,pay governmental taxes,fees and other costs as required <br /> for the electrical work,and to file for necessary approvals with the jurisdiction under 'ch the <br /> work is to be performed. Obtain Certificate of Inspection for the electrical work;this rtificate <br /> is a prerequisite to final acceptance of and final payment for the electrical work. <br /> B. QUALITY ASSURANCE <br /> 1. National Electrical Code`2iFPA 70" <br /> 2. Electrical Sweep Testing of Coaxial Cables � <br /> C. PRODUCTS <br /> 1. Products and materials are specified in other sections and herein. <br /> D. EXECUTION <br /> 1. Submittal of bid indicates sub-contractor is cognizant of all site conditions and work to be erformed <br /> under this contract. <br /> 2, perform all verification,observations,test,and examination of work prior to the ordering f the <br /> electrical equipment aad actual construction. Sub-contractor shall issue a written notice o all <br /> findings to the Contractor listing all malfunctions,faulty equipment and discrepancies. <br /> 3. Heights shall be verified with Contractor prior to installation. <br /> 4. Drawings are diagrammatic oaly,follow as closely as possible. <br /> 5. Electrical Service:208VAC,or 240VAC,single phase,3 wire 100 amp service. <br /> 6. Each conductor of every system shall be permanently tagged in each panelboard,pullbox, 'unction <br /> box,switch box,etc. <br /> 7. All materials and equipment shall be new and in perfect condition when installed and shal be of the <br /> best grade and of the same manufact�u�er throughout for each class or group of equipment.Materials <br /> shall meet with approval of the division of industrial safety and all governing bodies hav' g <br /> jurisdiction.Materials shall be manufactured in accordance with applicable standards e lished by <br /> ANSI,NEM�►,and NBFU. <br />• 8. All conduit installed maybe surface mounted unless otherwise noted. <br /> 9. Sub-contractor shall cairy out his work in accordance with all governing state,county,an local <br /> codes and OSHA and NEC. <br /> 10. Sub-contractor shall secure all necessary building permits and pay all required fees. <br /> CNS/C1S WEST COMMUNICATIONS ELECTRICAL MATERIALS METHODS <br /> SMMA NO.96419.16 16000-1 17 DEC.96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.