Laserfiche WebLink
2.05 FINISH <br /> A. Primer: Air-dried. <br /> PART 3 EXECUTION <br /> 3.01 E�s;AMINATION <br /> A. Section 01100 — General Requirements: Verification of existing conditions before <br /> starting work. <br /> g�w B. Verify that opening sizes and tolerances are acceptable. <br /> 3.02 INSTALLATION <br /> ��° A. Install frames in accordance with SDI-100 and DHI. <br /> B. Coordinate with masonry and gypsum board wall construction for anchor <br /> � placement. Provide a minimum of three anchors per jamb. Anchors shall be <br /> fabncated from 18 ga. steel. <br /> C. Coordinate installation of glass and glazing. <br /> � D. Coordinate installation of frames with installation of hardware and doors. <br /> `�'`'� E. Install roll formed steel reinforcement channels between two abutting frames. <br /> , Anchor to structure and floor. <br /> �:� <br /> 3.03 ERECTION TOLERANCES <br />�� A. Maximum Diagonal Distortion: 1/16 inch measured with straight edges, crossed <br /> � corner to corner. <br />� END OF SECTION <br />�� <br /> � <br /> � <br /> � <br />��� <br />�^`; Division 8—Section 08112 <br /> "' Page 3 of 3 <br /> � <br /> .�� <br />