My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project manual-2005
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2670 Kelley Parkway - 33-118-23-12-9999 Unit #100-common areas of condo bldg.
>
Misc
>
Project manual-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:46:57 PM
Creation date
3/27/2017 1:41:32 PM
Metadata
Fields
Template:
x Address Old
Address
2670 Kelley Pwky
Document Type
Misc
PIN
3311823129999
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� � <br /> 2.04 FLASHING MATERIALS, continued <br /> C. Nails: Standard round wire roofing type,hot dipped zinc coated steel of sufficient <br /> iength to penetrate through roof shea.thing. <br /> 2.05 FLASHING FABRICATION <br /> A. Form flashings to protect roofing materials from physical damage and shed water. <br /> B. Form�ections square and accurate to profile, in maximum possible lengths, free <br /> from distortion or defects detrimental to appearance or performance. <br /> C. Hem exposed edges of flashings minimum 1/4 inch on underside. <br /> D. Apply bituminous paint on concealed surfaces of flashings. <br /> PART 3 EXECUTION <br /> �� 3.01 Ex;AMINATION <br /> A. Section 01100—General Requirements: Verification of existing conditions prior to <br /> �� beginning work. <br /> ,� B. Verify that roof penetrations and plumbing stacks aze in place and flashed to deck <br /> surf�ce. <br /> C. Verify roof openings are correctly framed. <br /> � � D. Verify deck surfaces are dry, free of ridges,warps,or voids. <br /> 3.02 PR�PARATION <br /> �� A. Broom clean deck surfaces under eave protection and underlayment. <br /> � 3.03 INSTALLATION-EAVE(ICE DA1Vn PROTECTION <br /> A. Place eave edge and gable edge metal flashings tight with fascia boards.Weather <br /> lap�o�rts 2 inc�s and seal with plastic cement. <br /> B. Apply rubberized as�halt/polyethylene sheet eave protection in accordance with <br /> �; manufacturer's instructions. <br /> C. Apply la.p cement at rate of approximately 1 1/4 gaU100 sq ft over underlayment <br /> starter strip. <br /> D. Starting from lower edge of starter strip, �ay additiona136 inch wide strips of <br /> underla me t in la cement to roduce a two ly membrane. Weather lap plies <br /> minimum 19 inches and nail in place. Lap ends minimum 6 inches. Stagger end <br /> joints of ea.ch consecutive ply. <br /> E. Extenid eave protection membrane minimum 72"up from eave face. _-�z <br /> ��.� . <br />�� <br /> �Y; Division 7—Saction 07311 <br /> � Page 3 of 4 <br /> �'.� <br />
The URL can be used to link to this page
Your browser does not support the video tag.