My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project manual-2005
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2670 Kelley Parkway - 33-118-23-12-9999 Unit #100-common areas of condo bldg.
>
Misc
>
Project manual-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:46:57 PM
Creation date
3/27/2017 1:41:32 PM
Metadata
Fields
Template:
x Address Old
Address
2670 Kelley Pwky
Document Type
Misc
PIN
3311823129999
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z.,: <br /> SECTION 01100 <br /> GENERAL REQUIItEMENTS <br /> GENERAL REQUIREMENTS: <br /> A. Intent: This specification and the accompanying Drawings are complementary, and what is <br /> c�,lled for by either shall be binding as if called for by both. It is- the intent of these <br /> Specifications and Drawings to include all labor, materials, equipment and transportation <br /> necessary for the proper execution and completion of the Project. Each of the Subcontractors <br /> and Material Suppliers working under the Drawings and Specifications shall turn over his <br /> portion of the Project in a complete operating condition, inespective of whether the Drawings <br /> or the specifications, or both, cover each individual item in minute detail. Any ambiguities, <br /> �� errors, inconsistencies, or omissions discovered by the Subcontractor shall be reported to the <br /> � General Contractor(GC)immediately for resolution. <br />�� IT IS INTENDED THAT THIS SECTION OF THE SPECIFICATIONS SHALL APPLY TO <br /> � ALL OTHER SECTIONS OF THE SPECIFICATIONS AND TO THE SUBCONTRACTORS <br /> AND MATERIAL SUPPLIERS WORKING UNDER SEPARATE SECTIONS. <br /> �� B. Guarantees:It is understood that a11 Subcontractors shall guarantee their Work to be free from <br /> 5'� defects in the workmanship and materials for ONE YEAR BEYOND COMPLETION OF THE <br /> PROJECT, unless specifically stated otherwise in this Specification, or found within a specific <br />�� trade contract. This guaxantee shall include all materials and workmanship incorporated into the <br /> building. All material and equipment shall be new, unless specified otherwise. <br />� C. Tests: The Owner or GC shall have the right to perform independent tests on all the material <br /> and equipment furnished for the Project. Subcontractors shall each perform all tests on the <br /> �� work to be performed by them as required by law, ordinance or regulation; and shall provide <br /> the reyuired certificates of inspection. <br /> r, D. Permits, Licenses, Fees and Notices: Each Subcontractor and Material Supplier shall give to the <br /> proper authorities all notices as required by law, relative to the work in his direct charge or <br /> responsibility; obtain and a for all official fees buildin er i <br /> � temporary enclosures, obstructions, or excavations in public streets, etc. Further, they shall <br /> adequately adjacent property as provided by law and required by these Specifications and <br /> Drawings. <br /> � <br /> � <br /> 3 <br />�^� Division 1 -Section 01100 <br /> Page 1 of 2 <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.