Laserfiche WebLink
' �°� <br /> � 0 CI'TY OF ORONO <br /> Muaicipal Offices <br /> r��„ ��, Street Address Mailing Address: <br /> G 2750 Kelley Parkway P.O. Box 66 <br /> �i Orono,MN 55356 Crystal Bay, MN 5323-0066 <br /> 9kESH04 <br /> � <br /> � <br /> To: Th� Current Owner of Address 3155 JAMESTOWN RD <br /> City Ordin�ance requires that onsite sewage treatment systems in Orono be insp cted on a <br /> periodic ba�is. The onsite sewage treatment system at the above address has been in ected and <br /> the followi�g is known about the system. A sketch of the known components of th system is <br /> available f r most properties at the Orono City HaIL <br /> � <br /> Imminent ublic Health Threat <br /> Yes' <br /> No ' � <br /> If yes, plea$e contact the Onsite Systems Manager at 954-249-4626 within 10 days o receipt of <br /> this notice. I The septic system must be brought into compliance within 90 days. Fail e to do so <br /> will result i referral to the City Attorney for legal action. <br /> � <br /> System Ide�ntified as Non-Co pliant <br /> Yes I � <br /> No i <br /> If yes,syste�i must be brought into compliance by: <br /> Dec�mber 31, 2007 <br /> Dec�mber 31, 2010 <br /> Oth�r <br /> Septic Tanl�(s) Pump out Ne.eded <br /> Yes I � <br /> No i <br /> The city rec�mmends the septic tank(s) and/ar lift tank be serviced and p�}ped out e ery three <br /> (3) years. C�ty records indicate the tank(s)were last pumped out on 3 - �o <br /> The tank(s) Ishould be cleaned through the manhole and not through the inspection ipes, this <br /> allows for p�oper cleaning. <br /> Comments•I�, <br /> ��� ������ �j� <br /> Inspector: Date of Inspection: -r � � <br /> � Telephone (952) 249-4600 • Fax(952) 249-4616 <br /> www.ci.orono.mn.us <br />