Laserfiche WebLink
� <br /> s ' �� <br /> � N <br /> � �1-.� <br /> �,�� � <br /> -►� �P� � . r <br /> �� _ ��� �' !1 �1� �' <br /> V�`�� ,�_D�T c � <br /> April 11, 2016 �� � �S�/l C�� �'� <br /> Kenton Hove � �/�J � < < <br /> Divine Custom Homes � S�"��-�' r2�s�/� <br /> 397 Eagle Bluff Court <br /> Hudson, WI 54016 <br /> Re: Building Permit Application, Lot 3, Block 2, Mooney Lake Preserve (1070 Hunter Drive) <br /> Dear Mr. Hove: <br /> The City of Orono is in receipt of a revised survey for development of a home on the above <br /> referenced property. We note the following revisions from the previous survey: <br /> 1. The proposed house location has been pivoted and moved approximately 30 feet to the <br /> south. <br /> 2. The driveway has been relocated to eliminate the wetland crossing and to meet the <br /> required 35' setback from the wetland. <br /> 3. In order to relocate the driveway,the septic sites have been relocated to the southeast. <br /> 4. A rain garden has been added, as required per the Development Contract Special <br /> Provisions [Item 23(S)] —see attached. <br /> 5. A sport court has been added behind the garage. <br /> 6. The grading plan has been substantially revised to involve the movement of less than 500 <br /> cubic yards of material, eliminating the need for a Land Alteration Conditional Use <br /> Permit. <br /> Based on the above,the following items are required in order for the City to complete its review <br /> and be able to issue a building permit: <br /> a. ISTS Design. The septic design dated May 28, 2015 is not a complete design. In <br /> addition, the septic sites have been relocated. Your ISTS Designer(Rusty Olson)must <br /> complete a design based on the proposed house size, location and drainfield sites. His <br /> final design must be submitted and also shown on the survey. He must provide additional <br /> testing if necessary confirm that the relocated sites are acceptable. <br /> b. Rain Garden Specifications. Your surveyor/engineer must provide calculations and <br /> specifications for the proposed rain garden, for review by the City Engineer. <br /> c. Revised/LTpdated Building Plans and Elevations. Provide revised and updated <br /> building plans and elevations, showing the revised rear elevations based on the new <br /> grading plan, as well as depicting the proposed sport court. <br />