My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00589 - new house
Orono
>
Property Files
>
Street Address
>
H
>
Hunter Drive
>
1070 Hunter Drive - 25-118-23-42-0008 (Formeraly 300 Sixth Ave N)
>
Permits/Inspections
>
2016-00589 - new house
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:15 PM
Creation date
3/1/2017 1:45:32 PM
Metadata
Fields
Template:
x Address Old
House Number
1070
Street Name
Hunter
Street Type
Drive
Address
1070 Hunter Drive
Document Type
Permits/Inspections
PIN
2511823420008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Wednesday,June 01, 2016 4:00 PM <br /> To: Christine Mattson <br /> Cc: Mike Gaffron <br /> Subject: RE: 1070 Hunter Drive/#2016-00589 <br /> Chris, <br /> I've reviewed the grading plan with respect to Retaining walls and offer the following comments: <br /> 1. The land scape plan,the retaining wall site plan and the grading plan do not match. The grading plan depicts <br /> two long retaining walls. The landscape plan depicts two short walls. The Site plan from Civil Design depicts 1 <br /> long wall and 2 short walls. All three plans should reflect the same retaining walls. <br /> Please also note that Bob Bean completed a review of the raingarden and provided that input back to Mike. Copied <br /> below. <br /> Mike, <br /> 1 have completed review of the information submitted. Following are my comments for your consideration: <br /> 1. The rain garden has been adequately sized to maintain proposed peak runoff rates below existing <br /> conditions and retain a volume on site equal to 1" over the new impervious surfaces. <br /> 2. The rain garden should not be constructed until the upstream areas have been permanently stabilized. <br /> 3. The installation of the rain garden should be inspected by the City to ensure it is constructed as <br /> proposed. <br /> 4. A record survey of the rain garden should be provided after it is completed to ensure adequate volume <br /> is provided to meet requirements. <br /> If you have any questions or comments, please contact me to discuss. <br /> Thanks, <br /> Robert E. Bean,Jr,P.E. <br /> LEED Green Assoc. <br /> Bolton & Menk, Inc. <br /> Adam <br /> From:Christine Mattson <br /> Sent:Tuesday, May 31, 2016 8:36 AM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject: 1070 Hunter Drive/#2016-00589 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.