My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10022 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
333 Hollander Road - 25-118-23-43-0005
>
Permits/Inspections
>
2006-P10022 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:19 PM
Creation date
2/27/2017 1:31:27 PM
Metadata
Fields
Template:
x Address Old
House Number
333
Street Name
Hollander
Street Type
Road
Address
333 Hollander Road
Document Type
Permits/Inspections
PIN
2511823430005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
View images
View plain text
� <br /> in chrome only) shower head. <br /> • Install a 2" vinyl pan drain for ceramic shower. <br /> • 2-K23 50 biscuit Devonshire under mount lavatories with K394-4 Devonshire brushed <br /> nickel wide spread lavatory faucets. <br /> • 1-K3457 biscuit Devonshire elongated water closet with K4684 biscuit seat and a K484 <br /> brushed nickel trip lever. <br /> Ceramic Tile: <br /> • Floor: Install a mudset substrate on the floor of the bathroom and shower. <br /> • Supply and insta1112x 12 Katelo AV 143-12 x 12 with ceramic base on the main floor and <br /> grout it. <br /> • Supply and install Katelo AV 143- 2x2 tile and grout it. <br /> • Shower walls:Katelo AV 143-6x 12 over concrete board to 8'0"ceiling, 1-recessed shampoo <br /> compartment with a shelf(21eve1),soap shelf,.Also includes a bench on the one end of the shower <br /> to be constructed from treated plywood and covered with concrete board and waterproofed,then <br /> set on Katelo AV 143 6x 12 ceramic tile. The tile will be grouted. <br /> Glazing: <br /> • 1-shower wa1U door brushed nickel frameless clear glass 5'0"wide with a 2'0"door and a header <br /> to support it. <br /> • 1- set of three mirrors for the 6'0"vanity(two for doors, one for center mirror). <br /> • 1- set of two mirrors for the 5'3" vanity(one for the door, one for the center mirror). <br /> Laundry Room: <br /> Demolition/framing/drywall: <br /> • Remove the existing cabinet,countertops,ceramic tile floor in the laundry and closet,soffits,and <br /> remove the drywall necessary to make electrical changes. <br /> • frame opening for the Iron-a-Way <br /> • Remove the wallpaper. <br /> • Fill in the drywall at remodeled areas and tape three coats, and sand smooth for paint. <br /> Millwork and trim: <br /> • Supply and install the following cabinets:All laundry room cabinets to be paint grade with full <br /> overlay flat panel doors, melamine interiors. <br /> • 1- 4'0"w x 36"h x 24"d sink base cabinet <br /> • 1- 4'0"w x 36"h x 24"d base cabinet with drawers and doors. <br /> • 1- 8'6"w x 42"h x 12"d upper cabinet with doors. <br /> • 1- 4'0"w x 42"h x 12"d upper cabinet with doors. <br /> • 1-3'9"w x 72"h x 18"d locker cabinet with open bench,and beaded porch board back <br /> and a shelf for hats and board with hooks for coats.. <br /> • 1- 3'9"w x 24"h x 12" d upper locker cabinet. <br /> An allowance of$250.00 is included to purchase pulls, knobs and hooks <br /> • Install a E42 swivel Iron-a-Way with a door to match the cabinets. <br /> • Supply and insta113 '/2" primed crown molding at walls and cabinets. <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).