Laserfiche WebLink
r <br /> end of the vanity. <br /> • 4'7"wide x 8'0"high x 1'3"/1'8"deep linen storage cabinet with two doors with hardware <br /> cloth inset panels(Allowance for hardware cloth of$400.00 is included in cabinet price) <br /> and six drawers to fit into the recess between the shower and walk in closet. <br /> • Supply and install a framed mirror(in glazing pricing) at each vanity <br /> • We have included an allowance of$250.00 for the purchase of knobs and pulls for the cabinets. <br /> • Supply and install a 6 panel fir pocket door with 2 1/4" primed princeton stop and casing. <br /> • Install double 1 5/16" chrome rod and melamine shelves in the closet on 4' wall. <br /> • Supply and install a shoe rack 1'4" wide x 10 shelves high on the north wall of the closet. <br /> • Install3 %2" primed crown molding at the ceiling of the bathroom and around the cabinets. <br /> • Install customers bathroom accessories. <br /> • Cambria in the Coswell Creme color in the following areas: <br /> • 1-vanity top 22"x 63"with two side splashes and a back splash and an OG front edge, <br /> one sink cut out. <br /> • 1-vanity top 22"x 72"with a partial back splash,an OG edge,and one sink cut out. <br /> Electrical: <br /> Demo:make up light over both vanities.Both switches can be reused for new lighting at the <br /> vanities. <br /> • switch for existing shower to be used to power a recessed can in ceiling vs in soffit of the <br /> shower(the shower light to be moved from soffited ceiling of shower to ceiling of closet) <br /> • Move GFI on side wall of Gary's vanity where the pocket door is going <br /> • Possibly move outlet at Mary's vanity due to upper cabinet <br /> New: <br /> • Add 2- sconce lights at the side of the upper cabinets at Mary's vanity supplied by <br /> customer(may need wiremold inside upper cabinet) <br /> • Add a recessed can at the center of the vanity connected to two recessed cans over <br /> Gary's vanity. <br /> • Add recessed can over new shower.(the fixture will be offset to allow for the rainwater <br /> shower head) <br /> • Replace the existing bath fan with a new 70 cfm Panasonic bath fan. <br /> • Add drawer outlet for hair dryer. <br /> Plumbing: <br /> • Demo existing shower and tub valves and cap off waste,vent,and water supplies below the floor <br /> or behind the walls. <br /> • Rough in the new shower drain,valves,and heads.(The rainwater head in the ceiling will require <br /> the furring down of the shower ceiling slightly to prevent the water from freezing in the winter) <br /> • Furnish and install the following plumbing fixtures and valves: <br /> • 1-Kohler K304K valve,KT396 brushed nickel trim,with a K672 diverter valve and a <br /> KT376-4 brushed nickel trim,with a ceiling pipe and flange with K10122 CP(available <br />