Laserfiche WebLink
Page 4 <br /> h. Electric—rewire bath <br /> *New recessed shower light. <br /> *Replace recessed light trims. <br /> *New switches. <br /> *Ensure outlet meets GFCI code. , <br /> *Replace bath fan. 1110 CFM Nutone or Broan quiet fan. <br /> i. HVAC <br /> *Hook up new fan to existing duct work. <br /> j. Vanity top <br /> *Supply and install a new vanity top. Material to be determined. <br /> k. Misc. <br /> *Supply and install new bath hardware. <br /> -Towel bars—2 <br /> -Towel ring— 1 <br /> -Robe hook— 1 <br /> -Toilet paper holder— 1 <br /> *Supply and install new frameless shower enclosure panels and door. 3/8" clear <br /> glass. <br /> *Supply and install a new mirror at vanity. <br /> I. General <br /> *Clean site daily. <br /> *Haul all related debris. <br /> *Protect non-construction areas. <br /> *Supply all materials and labor unless noted. �v3 <br /> *Supply all permits and coordinate all inspections. PROV3DE PUI�P A�Q/QR <br /> PLUMBING ACCESS <br /> Alternate—Tub deck vs. Free standing tub THROUGH TILE UNACCEPTABLE <br /> Free Standing Tub—in place of tub deck we would remove the deck and prep the floor <br /> and tile to match. We would also repair and finish walls to match. A free standing tub <br /> would be installed with a free standing faucet. <br />