Laserfiche WebLink
� . <br /> Page 3 <br /> e. Drywall <br /> *Repair drywall at all walis due to tile removal. Replace sheetrock as necessary. <br /> *Tape all walls and sand smooth. <br /> *Repair and tape sheetrock at vanity and mirror area. <br /> *Repair sheetrock at exterior of shower area,tape and sand. <br /> *Restore all other surfaces to a smooth, sound condition. <br /> f. Painting <br /> *Prime and paint ceiling. <br /> *Paint al walls—Faux finish to match bedroom as close as possible or similar finish. <br /> *Re-paint windows, window trim, door and door trim. <br /> g. Plumbing <br /> *Tub <br /> -Modify waste, vent and water lines for a new tub and faucet. <br /> -Supply and install a new soaker tub and tub faucet. <br /> *Shower <br /> -Rough-in shower for a new valve, shower head and hand held shower. <br /> -Rough-in a new shower drain. <br /> -Supply and install a new valve,faucet, shower head, hand held shower and <br /> mixing valve. <br /> *Lavs—2 <br /> -Modify rough-ins for 2 lavs. <br /> -Install (2) sinks and (2)faucets. <br /> -Supply two lavs and 2 faucets. <br /> *Toilet <br /> -Supply and install a new toilet at same location. <br />