Page 2 <br /> #2017-00090 <br /> tarps and controlled with perimeter control devices immediately. If left for more than seven(7)days, <br /> it must be stabilized with mulch,vegetation,tarps,or other means. <br /> f. The Certificate of Survey should be revised to indicate perimeter erosion control measures(silt fence, <br /> bio logs,etc.) down gradient from proposed work. Measures must be installed by the Contractor and <br /> inspected by the City prior to any work. Contractor must provide a minimum 24 hour notice prior to <br /> inspection. � <br /> g. Street cleaning-Streets shall be cleaned and swept within 24 hours whenever tracking of sediments <br /> occurs and before sites are left idle for weekends and holidays. <br /> 2. Landscape Plan. A landscape plan has been submitted. If there are changes during construction a revised plan <br /> must be submitted showing all the proposed exterior/landscaping improvements, i.e. patios, grading, <br /> sidewalks, retaining walls, etc. Any proposed changes to landscaping should also be reflected on an updated <br /> survey. <br /> 3. Minnehaha Creek Watershed District (MCWD). Your project may trigger the Minnehaha Creek Watershed <br /> District's (MCWDs) permitting requirements; please contact the MCWD directly at 952-471-0590 regarding <br /> your project. Please note,the City of Orono will not issue a building permit without a copy of the MCWD permit <br /> or documentation stating the proposed project does not trigger any of their permitting requirements. <br /> 4. Separate City Permits Required for: <br /> a. Septic System <br /> Please feel free to contact me at 952.249.4627 or by email at mcurtis@ci.orono.mn.us if you have any questions on the <br /> above requirements. <br /> Sincerely, <br /> CITY OF ORO "' <br /> 1�/'��`'�1�� <br />, <br /> Melanie Curtis <br /> Planner <br /> c via email Chris Norton, Norton Homes, LLC <br /> Source Land Development <br /> Bruce Lehrer <br /> Roger Peitso, Building Official <br /> enclosure <br />