My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-00901 - new septic
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
265 Hollander Road - 25-118-23-43-0016
>
Septic
>
2011-00901 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:54 PM
Creation date
2/22/2017 1:01:36 PM
Metadata
Fields
Template:
x Address Old
House Number
265
Street Name
Hollander
Street Type
Road
Address
265 Hollander Road
Document Type
Septic
PIN
2511823430016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> '� '�'�� PUMP SELECTION�PROCEDURE <br /> , <br /> . � <br /> 1. Determine pump capacity: j <br /> , - -;A. Gravity distribution j <br /> I. Minimum required discharge is 10 gpm i . <br /> 2. Maximum suggested discharge is 45 gpm. For otljier <br /> estaUlishments at least 10%greater than the wate supply rate, <br /> but no faster than the rate at which effluent will fl�w out of the <br /> disriibution device. <br /> B. Pres�ure distribution � <br /> See pressure distribution work sheet � <br /> I <br /> , <br /> From A or B Selected pump capacity: �gpm <br /> �. Deternnine pump head requirements: � <br /> A.Elevativn difference between pump and paint of dis�hargQ? soi treoiment system <br /> �_feet i & t of�rge <br /> i ��� <br /> B.Special head requirement?(See Figure at righf-Special Head Requirements) total pipe <br /> � feet inlet � 2A.elevation <br /> G Calculate Friction loss pipe <br /> difference <br /> 1. Select pipe diameter�_in --- q � <br /> ----•---••----------------- ------� <br /> ` 2. Enter Figure E-9 with gpm(1A or B)and pipe dia�eter(Cl). <br /> Read friction Ioss in feet per 100 feet from Figure �-9 Special Head Requf�ements <br /> Friction Loss= �•� ft/100ft of pipe Gravity Distribution 0 ft <br /> 3. Deternnine total pipe length from pump discharg to soil treatment Pressure Distribution 5 ft <br /> discharge point.Estimate by adding 25 percent t pipe length for <br /> fitting loss.Total pipe length times 1.25=equival nt pipe length E-4:Friction lou in Plastic Pipe <br /> "ls feet x 1.25= l 1°I feet i <br /> � Per 1�feet <br /> 4.Calculate total friction loss by multiplying friction loss(C2) nominai <br /> in ft/100 ft by the equivalent pi�e length(C3) and,clivide by 100. pipe diameter <br /> = a•S ft/100ft x 1 � +100= '� I ft ftow rate 1.5" 2° 9" <br /> m <br /> � D. Total head required is the sum of elevation differen�e(A),special � 2•47 0.73 0.11 <br /> head requu-ements(B),and total friction loss (C4) � 25 3.73 1.11 0.16 <br /> �ft+_ � ft+ a ft= � 30 5.23 1.55 0.23 <br /> � 35 6.96 2.06 0.30 <br /> Total head• feet � ao a.9i 2.ea o.39 <br /> 3. Pump selection a5 i�.o� 3.2s o.as <br /> � 50 13.46 3.99 0.58 <br /> I 55 4.76 0.70 <br /> A pump must be selected to deliver at least,'�gpm bp 5.60 0.82 <br /> (1A or B)with at least�_feet of total head (2D� 6,5 . 6.48 0.95 <br /> � 70 7.44 1.09 <br /> I hereb certify th 1 hav co gleted this work in accord ce with applicable ordinances, rules and laws. <br /> 4+�"�'• i ature I �'! license# '' "`Q date <br /> �"�'-'f�� ) ( ) ( ) <br /> _ j <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.