Laserfiche WebLink
� � � � � � � � � � � � � � i � � � i <br /> July 24, 2002 Page 2 <br /> Hollander Residence Limited Structural Evaluation. <br /> MGI Commission#02162 <br /> for Mr. John Hollander <br /> RELATIVE REPAIR SCHEDULE, continued <br /> Description Latest date to Bestin/Occur <br /> 15.HeatingNentilation repairs made. August 12, 2002 <br /> 16.Plumbing repairs made. August 12, 2002 <br /> 17.Windows cleared of plastic and made to be operable and lockable. August 12, 2002 <br /> 18.Exterior of house is prepped, caulked and painted. August 12-30th <br /> 19.City inspection of electrical/heating/ventilation and plumbing and window repairs. August 16, 2002 <br /> 20.Mr. Hollander moves back into the house. August 16, 2002 <br /> 21.Gutters&downspouts installed. August 30, 2002 <br /> 22.City inspection of house exterior work. September 3, 2002 <br />