My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00491 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
H
>
Highwood Road
>
4099 Highwood Road - 07-117-23-44-0012
>
Permits/Inspections
>
2009-00491 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:39:59 PM
Creation date
2/1/2017 2:28:31 PM
Metadata
Fields
Template:
x Address Old
House Number
4099
Street Name
Highwood
Street Type
Road
Address
4099 Highwood Rd
Document Type
Permits/Inspections
PIN
0711723440012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> Generated by REScheck Package Generator <br /> Inspection Checklist <br /> Date: 08/12/09 <br /> Ceilings: <br /> ❑ Ceiling:R-49.0 cavity insulation <br /> Comments: <br /> Note:The ceiling R-values do not assume a raised or oversized truss construction. If the insulation achieves the full insulation thickness <br /> over the plate lines of exterior walls, R-30 insulation may be substituted for R-38 insulation and R-38 insulation may be substituted for R-49 <br /> insulation.Ceiling R-values represent the sum of cavity insulation plus insulating sheathing(if used). <br /> Above-Grade Walls: <br /> ❑ Wall: R-19.0 cavity insulation <br /> Comments: <br /> Note:Wall requirements apply to wood-frame wall constructions. Metal-frame wall or mass(concrete,masonry,log)wall equivalent <br /> R-values can be found in the Help User's Guide. <br /> Basement Walls: <br /> ❑ Basement:8.0'ht/5.0'bg/8.0'insul, R-11.0 cavity insulation <br /> Comments: <br /> Note:Walls of conditioned basements below uninsulated floors must be insulated from the top of the basement wall to a depth of 10 feet <br /> below ground level or to the level of the basement floor,whichever is less.The entire opaque portion of any individual basement wall with <br /> an average depth less than 50%below grade must meet the same R-value requirement as above-grade walis. Basement doors must meet <br /> the door-U-factor requirement. <br /> Windows: <br /> ❑ Window: U-factor:0.350 <br /> For windows without labeled U-factors,describe features: <br /> #Panes Frame Type Thermal Break? Yes No <br /> Comments: <br /> Doors: <br /> ❑ Door:U-factor:0.350 <br /> Comments:Front door exempt <br /> Note:Door U-values must be tested and documented by the manufacturer in accordance with the NFRC test procedure or taken from the <br /> door U-factor table in the Help User's Guide. If a door contains glass and an aggregate U-factor rating for that door is not available,include <br /> the glass area of the door with your windows and use the opaque door U-factor to determine compliance for the door.One door may be <br /> excluded from this requirement(i.e.,may hav a U-factor greater than 0.35). <br /> Heating and Cooling Equipment: <br /> L] Furnace: :95 AFUE or higher <br /> Make and Model Number: <br /> ❑ Air Conditioner: : 10 SEER or higher <br /> Make and Model Number: <br /> Air Leakage: <br /> � Joints,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed. <br /> � Recessed lights are 1)Type IC rated,or 2)installed inside an appropriate air-tight assembly with a 0.5"clearance from combustible <br /> materials.If non-IC rated,fixtures are installed with a 3"clearance from insulation. <br /> Skylights: <br /> � Minimum insulation requirement for skylight shafts equal to or greater than 12 inches is R-19. <br /> Project Title: AI and Renee Searn ������� � � ������.�������� ��� � Report date: 08/12/09 <br /> Data filename: Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.