My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-2013 Council Packet
Orono
>
City Council
>
1950-2024
>
2010-2019
>
2013
>
07-08-2013 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2015 10:31:58 AM
Creation date
4/7/2015 2:02:35 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, June 24, 2013 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> Page 7 of 15 <br />PUBLIC WORKS DIRECTOR/CITY ENGINEER’S REPORT <br /> <br />Struve reported the Public Works Department has been working nonstop all weekend due to the <br />thunderstorms in the area. At one time 18 of the City’s 45 sanitary lift stations were without power. The <br />Public Works Department moved generators around to help alleviate the situation and at this time there <br />was only one known sewer backup that affected three homes. Struve noted that backup was actually the <br />result of the failure of a transfer switch. The onsite generator was running but did not automatically <br />switch over and power the lift station. <br /> <br />The Public Works Department has been out clearing a number of trees. There is a residential drop site on <br />McCulley Road that will be open from 10 a.m. to 9 p.m. for residents only. Struve noted contractors, <br />even if they are performing work for a resident, will not be allowed in the site unless the resident is <br />present and shows an ID. The City will not be doing any curbside chipping and picking up of people’s <br />brush piles given the amount of work required to clear the trees the City is responsible for. <br /> <br />McMillan asked how long the site will be open. <br /> <br />Struve indicated it will be open at least a week and that the Public Works Department will re-evaluate the <br />situation in one week. The information on the drop-off site is posted on the City’s website. Struve <br />indicated the site may be open longer based on residential need. <br /> <br />*7. BEDERWOOD PARK GRANT AND PROJECT APPROVAL <br /> <br />Levang moved, Printup seconded, to accept the grant from Hennepin Youth Sports Program in the <br />amount of $7,500 and to accept the proposal from Flagship Recreation in the amount of $50,644.20 <br />for improvements at Bederwood Park. VOTE: Ayes 5, Nays 0. <br /> <br /> <br />8. EAGLE SCOUT PROJECT DISCUSSION <br /> <br />Struve noted Tom Longe is out of the country at the moment and unable to attend tonight’s meeting. Mr. <br />Longe has requested the Council review the verbiage he is proposing be placed on the veterans memorial <br />and e-mail any changes to him. The contractor needs the information by the end of June. <br /> <br />Bremer indicated she is okay with the wording. <br /> <br />Levang stated she is not sure about the last line that states “Land of the Free Because of the Brave” since <br />it appears to be a little redundant. <br /> <br />McMillan commented that perhaps just the language stating “Dedicated 2013” could go there. <br /> <br />Printup stated he reads it as standard memorial language. <br /> <br />Levang commented it just feels somewhat redundant given the language at the top. <br /> <br />McMillan questioned whether that language should be in quotations or italicized. <br /> <br /> <br /> <br />Item #03 - CC Agenda - 07/08/2013 <br />Approval of Council Minutes 06/24/2013 <br />[Page 7 of 15]
The URL can be used to link to this page
Your browser does not support the video tag.