My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00589 - new septic
Orono
>
Property Files
>
Street Address
>
H
>
High Lane
>
3445 High Lane - 05-117-23-12-0025
>
Septic
>
2009-00589 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:16:18 PM
Creation date
1/26/2017 2:46:52 PM
Metadata
Fields
Template:
x Address Old
House Number
3445
Street Name
High
Street Type
Lane
Address
3445 High La
Document Type
Septic
PIN
0511723120025
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. APPROXIMATE MOUND MATERIAL CALCULATIONS: <br /> A. Calculate Bed (rock) Volume: Bed Length (2.C)X Bed Width (2.6)X Depth = Votume (ft3) <br /> 38.0 ft X 10.0 ft X 1.0 = 380.0 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calculate cubic yards: <br /> 380.0 ft3 : 27 = C 14.1 yd3 <br /> Add 20%for constructability: 14.1 yd3 X 1.2 = 16.9 yd3 <br /> B. Calculate Clean Sand Volume: <br /> Upslope Volume: ((Upslope Mound Height - 1)x 3 x Bed Length)=2 =cubic feet <br /> (( 3.0 ft - 1) X 3.0 ft X 38.0 )=2= 114.0 ft3 <br /> Downs(ope Voiume: ((Downslope Height- 1) x Downslope Absorption Width x Media Length) �2 =cubic feet <br /> (( 4.2 ft- 1) X 10.0 ft X 38.0 )=2= 608.0 ft3 <br /> Endslope Vofume: (Downslope Mound Height- 1) x 3 x Media Width =cubic feet <br /> ( 4.2 ft- 1 ) X 3.0 ft X 10.0 ft = 96.0 ft3 <br /> Votume Under Rockbed: Average Sand Depth x Media Width x Media Length =cubic feet <br /> 1.6 ft X 10.0 ft X 38.0 ft = 608.0 ft3 <br /> Totat Clean Sand Volume: Upslope Volume +poNrnslope Volume +Ends(ope Volume + Volume Under Medio <br /> 114.0 ft3 + 608.0 ft3 + 96.0 ft3 + 608.0 ft3- 1426.0 ft3 <br /> Divide ft3 by 27 ft3Jyd3 to calculate cubic yards: 1426.0 ft3 : 27 = 52,g yd3 <br /> Add 20%for constructabitity: 52.8 yd3 X 1.2 = 63.4 yd3 <br /> C. Calculate Sandy Berm Vo(ume: <br /> Total Berm Volume(approx): ((Avg. Mound Height- .5 ft topsoil)x Mound Width x Mound Length) =2 =cu. ft. <br /> ( 3.6 _ 0.5 )ft X 39.0 ft X 62.0 )=2= 3747.9 ft3 <br /> Total Mound Vo(ume- Ctean Sand volume-Rock Volume=cubic feet <br /> 3747.9 ft3 _ 1426.0 ft3 _ 380.0 ft3 = 1941.9 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calculate cubic yards: 1941.9 ft3 : 27 = 71.9 yd3 <br /> Add 20%for constructability: 71.9 yd3 x 1.2 = 86.3 yd3 <br /> D. Calculate Topsoii Moterio! Volume: Total Mound Width X Tota!Mound Length X.5 ft <br /> 39.0 ft X 62.0 ft X 0.5 ft = 1209.0 ft3 <br /> Divide ft3 by 27 ft3/yd3 to catculate cubic yards: 1209.0 ft3 : 27 = 44.8 yd3 <br /> Add 20%for constructability: 44.8 yd3 X 1.2 = 53.7 yd3 <br /> I hereby certify that I have completed this work in accordance with all appiicable ordinances, rules and laws. <br /> Joseph J Olson J 810 8/t0/09 <br /> (Designer) (Signature) (License#) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.