My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-21-2014 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2014
>
01-21-2014 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 10:47:09 AM
Creation date
4/6/2015 2:28:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, November 18, 2013 <br />6:30 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br />Page 7 of 35 <br /> <br />Proposed Lot 2, Block 1, consists of 0.35 acre with frontage along the road and cul-de-sac. The <br />functional lot width measured perpendicular to the side lot lines is 90 feet. The suggested home site is set <br />back the required 25 feet from the front and 35 feet from the wetland, but the shape of the buildable <br />envelope is very restricting due to the lot configuration. A 15-foot drainage and utility easement along <br />the east boundary will accommodate tree preservation and drainage. This extra-wide easement extends <br />from the cul-de-sac to the wetland and will need to be explained why it is wider than normal. <br /> <br />There is a rain garden proposed between Lots 1 and 2 that is partially in the proposed road right-of-way <br />and partially within each lot. Maintenance covenants for this rain garden will have to be established. <br /> <br />Lot 3, Block 1, consists of 0.32 acres of contiguous dry buildable, with an added 0.12 acres of dry <br />buildable located north of the creek. Lot 4, Block 1, is proposed to have 0.32 acres of contiguous dry <br />buildable, with an added 0.34 dry acres northeast of the creek. Lot 5, Block 1, will have 0.42 acres of dry <br />buildable, with an additional 0.06 acres of dry land northeast of the creek. <br /> <br />As it relates to the two lots south of the road, the only question that needs to be addressed is whether the <br />side street setback to Willow should be 50 feet instead of the 25 feet depicted on the layout. <br /> <br />One of the RPUD standards relates to the 15 percent lot coverage limit. The RPUD district does not <br />specifically establish a lot coverage by structures limit. Instead, the RPUD standards limit individual lots <br />to 50 percent hardcover and an individual floor area ratio of 0.5. This means that a 14,000 square foot lot <br />is allowed 7,000 square feet of floor space. <br /> <br />The seven proposed home footprints range from 1,750 square feet to 2,200 square feet, yielding lot <br />coverages ranging from 7 percent to 12 percent. Although the applicant does not propose to build large <br />homes, Staff believes it would be appropriate to limit home sizes based on the 15 percent lot coverage <br />limit since this will avoid the creation of extremely large homes if just based on the floor area ratio. <br /> <br />Gaffron noted the proposed landscaping plan has not been thoroughly reviewed by Staff. The RPUD <br />standards require that each RPUD development shall provide a minimum of ten percent of the gross <br />project area in private recreational uses for project residents. Such area shall be for active or passive <br />recreational uses suited to the needs of the residents of the project. The applicant has been advised that <br />0.5 acre of the development site must be devoted to recreation area. This could be accomplished by <br />establishing access easements to a walking trail to the proposed tree preservation area at the rear of Lots <br />3, 4, and 5, Block 2. Creation of that walking trail raises the question of whether the wetland and tree <br />preservation areas should be incorporated into a separate outlot rather than as parts of individual lots. <br /> <br />The developer will pay all costs of utility construction and installation. It is expected that Long Lake will <br />charge unit connection fees for new connections to their system per the sewer and water agreement. In <br />similar subdivisions involving developer-installed utilities, Orono has generally not collected a separate <br />sewer or water connection charge. <br /> <br />The applicant is proposing a 50-foot wide corridor to create a new public road with a 100-foot cul-de-sac, <br />which conforms to the requirements within the subdivision ordinance for a local public road. This is <br />proposed as a public road rather than private primarily because of the density, which was the basis for <br />Glendale Cove being public. The proposed paved width of the public road is shown as 25 feet where the <br />Code requires 28 feet for three to ten homes. The preliminary plat has not yet been forwarded to the Long <br />Lake Fire Chief/Fire Marshall for review. <br />Item #01 - PC Agenda - 01/21/14* <br />Approval of Planning Commission Minutes 11/18/2013 <br />[Page 7 of 35]
The URL can be used to link to this page
Your browser does not support the video tag.