My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-2014 Council Packet
Orono
>
City Council
>
2014
>
01-27-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:55 PM
Creation date
4/6/2015 1:13:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
reclamation.Jana worked�vith the DNR, Rural Development, and the <br /> Public Service Commission. <br /> Engineering Report—City of Abbotsford,Wis. Project Engineer for an <br /> , engineering report comparing several options for additional supply <br /> for the City.Jana completed the report showing options that included <br /> surface�vater, groundwater under the influence of surface water, and a <br /> 32-mile pipeline. <br /> Water System Study—Village of Balsam Lake,Wis. Project Manager <br /> for the�vater system study.Jana was responsible for water modeling <br /> and projecting future water system needs, and follow-up work <br /> including an in-depth water storage study and lifecycle analysis of <br /> options. <br /> Water Rate Study—Village of Frederic,Wis.Project Engineer for the <br /> PSC water rate increase worksheets for the Village.Jana coordinated <br /> bet�veen the PSC and Village Staff. <br /> Water System Study—Westboro,Wis. Project Engineer for a water <br /> model and system study for the sanitary district to address poor water <br /> quality concerns, as well as high water loss. Several recommendations <br /> �vere made. SEH assisted Westboro in obtaining fiznding for the <br /> projects. <br /> Water System Study—City of Barron,Wis. Project Engineer for the <br /> water system study.Jana performed�vater modeling and a study which <br /> analyzed storage capacity, supply capacity, and the overall condition of <br /> the system, and made recommendations for improvements. <br /> Water Rate Study—City of New Richxnond,Wis. Project Engineer for a <br /> rate study to evaluate alternative rate structures.Jana worked with the <br /> Public Service Commission to lay out alternarives for the city's water <br /> rates. <br /> Sanitary Sewer and Water System Needs Analysis—City of <br /> New Richmond,Wis. Project Engineer for a planning study for water <br /> and sewer system planning.Jana analyzed existing system information <br /> as well as projected growth to recommend improvements and timing. <br /> She also updated the water model and analyzed the existing and <br /> future system. <br /> Comprehensive Water Study Plan—River Falls Municipal Utilities, <br /> Wis. Project Engineer for the planning study as part of the capital <br /> improvement plan for the Utility.Jana updated the existing water <br /> study plan as�vell as the water model,working with the utility staff, city <br /> staff, and local de��elopers to assess water needs over the next several <br /> years. <br /> J Water System Needs Analysis—River Falls Municipal Utilities,Wis. <br /> � Project Engineer for a planning study completed for the River Falls <br /> � <br /> SEHJana Nyhagen,PE � Professional Engineer � page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.