Laserfiche WebLink
• - Mr. Jesse Struve, PE <br /> • January 6, 2014 <br /> �� � • Page 4 <br /> and ten year intervals, but are not typically performed this often, nor required unless severe <br /> localized corrosion is determined. <br /> 3. Selection of coating system and design details. A three coat epoxy system is commonly <br /> provided in the design-bid-build industry. In addition, a zinc primer is often used for interiar and <br /> exterior coating systems. On design-bid-build projects, SEH often has recommended a zinc <br /> primer in the interior wet with a two coat epoxy system, but provides a lesser two coat epoxy for <br /> their SEH�DB proposals. Added mil thickness provides additional protection of the steel <br /> substrate for a relatively low cost. This higher level of protection is included in our construction <br /> cost estimate. <br /> 4. Known schedule. Owner has control of the schedule. <br /> 5. Engineer works for the Owner, not the Contractor. <br /> G:\Orono\010614 struvememo.dotx <br /> You created this PDF from an application that is not licensed to print to novaPDF printer(http://www.novapdf.com) <br />