My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-2014 Council Packet
Orono
>
City Council
>
2014
>
01-13-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:19 PM
Creation date
4/3/2015 12:46:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO CITY COUNCIL MEETING <br /> Monday,December 9,2013 <br /> 6:30 o'clock p.m. <br /> (PUBLICHEARING, Continued) <br /> Levang noted Page 25 lists city hafl roof replacement at a cost that was based on a 2008 report. Levang <br /> asked whether there are any newer cost estimates. <br /> Struve indicated that was not assessed as part of the study on the po(ice department building and would <br /> need to be reassessed at some point. <br /> Levang stated she is not sure what that cost was based on. <br /> BrEmer stated there was concern raised about the roof in 2008 and soine minor repairs were made but that <br /> those were not lonb-term. <br /> Levang asked whether the summer golf course helper has commented on the equipment costs listed on <br /> Page 7. <br /> Struve indicated he has not spoken with the summer helper but that he has reviewed the equipment costs <br /> with the golf course manager. <br /> Levang asked what the costs for the Navarre park-��-ride relates to. <br /> Struve stated that is to strip the parking lot. <br /> Levang asked what the Navarre planters relate to. <br /> Struve indicated that item was supposed to be removed. <br /> McMillan noted the Brown Road landfill was also supposed to be removed. McMillan stated as it relates <br /> to the CIP, the Navarre trail sidewalk is listed for 2015. McMillan stated slle has some concerns listing a <br /> specific year for that project. <br /> Struve stated that item was listed for 20]4 in the previous CIP and Staff will be exploring some potential <br /> funding sources. Struve stated that item will likely be delayed if funding sources are not found. <br /> McMilian noted yearly inspection of the north water tower is also listed and asked whether that should be <br /> an opecating cost. <br /> Struve stated that is based on a proposai froin an engineering firm to repaint the water tower, which <br /> contains a five or ten year period for inspections. Struve noted that item has not been finalized at this <br /> poi��t and that it will be brought before the City Council likely in January. <br /> McMillan indicated she would like to see a 15-year CIP created. <br /> Levang stated she would like the opportunity to study it further. <br /> Bremer asked whether it is necessary to approve it tonight. <br /> Page 8 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.