My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-2015 Council Packet
Orono
>
City Council
>
1950-2024
>
2010-2019
>
2015
>
03-09-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2015 3:18:37 PM
Creation date
4/2/2015 3:18:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO CITY COUNCIL MEETING <br /> Monday,March 9,2015 <br /> 7:00 dclock p.m. <br /> (4. BOY SCOUT BRIDGE,HENNEPIN COUNTY BRIDGE ENGINEER JAMES ARCHER, <br /> continued) <br /> Levang suggested some type of sign that says steep hill ahead or some type of advanced warning be <br /> erected. <br /> Archer stated typically 10 to 14 days prior to the project starting signage will be put up. <br /> McMillan asked if there is a date set yet for the open house. <br /> Archer indicated they do not have a definite date set yet but that it will be held at Orono City Hall. <br /> McMillan asked if there are any public comments on this project. <br /> John Nyquist, 1432 Baldur Park Road,asked whether the bridge clearance will be raised for boat traffic. <br /> Archer stated they have preliminarily looked at the clearance and that it may be possible to raise the <br /> vertical clearance by four inches. Archer indicated they are not able to raise it further than that without <br /> tuming it into a two-mile project. <br /> Ralph Kempf, 3675 Togo Road,noted there are two marinas on Maxwell Bay and that when the water <br /> elevation gets raised; oftentimes boat traffic cannot go under that bridge. Kempf stated if they can <br /> increase it by four inches,in his view the boating population will be very appreciative. <br /> Kempf asked if the architectural finishes will be determined by the time of the open house. <br /> Archer stated that would be ideal but that it will be more likely there will be some preliminary renditions. <br /> Archer stated in his view they are not far enough in the design process to finalize that component but that <br /> he can have some samples of other bridges for the residents to look at. <br /> Kempf asked if there will be another opportunity after the open house for public comment. <br /> Archer stated they can defmitely reconvene the open house is there is sufficient public interest in holding <br /> another one. Information will also be posted to the website for the residents to access. The residents will <br /> also have the ability to submit written comments at the open house. <br /> Walsh noted he lives near the area where the County Road 19 project was done and that it went well. <br /> Walsh stated the extra width will be greatly appreciated. <br /> 5. NAVARRE BANNER DESIGN—JOAN WOLFE <br /> Joan Wolfe stated the City Council may have received an electronic document that is significantly darker <br /> than what is really being proposed and that she has some images that are closer to the actual banner. <br /> Wolfe stated during the process of coming up with a design, she had the assistance of local artist Mary <br /> McKenzie,who created the design. Wolfe stated when they first looked at this;their goal was to <br /> incorporate a very welcome title on the top of the banner. <br /> Page 5 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.