Laserfiche WebLink
MINUTES OF THE <br /> ORONO CITY COUNCIL MEETING <br /> Monday,March 9,2015 <br /> 7:00 o'clock p.m. <br /> (4. BOY SCOUT BRIDGE,HENNEPIN COUNTY BRIDGE ENGINEER JAMES ARCHER, <br /> continued) <br /> foundation will be removed to channel bottom and made wider. At this time the architectural finishes are <br /> undetermined. Retaining walls may be incorporated into the design,but at this point it is uncertain how <br /> much exposed concrete there will be. Archer indicated they typically do not incorporate architectural <br /> features for wa11s under four feet and that component still remains to be determined. <br /> Archer displayed a picture of an existing section of the bridge and noted that the new bridge would be <br /> approximately eight feet wider than the existing structure. <br /> Archer indicated Hennepin County is working with City Staff on holding an open house at the end of <br /> March at Orono City Hall. The mailing area will include everyone along Tonkawa Road and up to <br /> Bayside Road.The residents on the south side of North Arm Bay will also be notified to get their <br /> feedback on whether the inside of the bridge should be lit and other aesthetic features of the bridge. It is <br /> anticipated the mailing will go out sometime this week. <br /> Archer noted this project will be eligible to receive federal funds as well as funds from Hennepin County. <br /> The City of Orono is not expected to contribute any funds to the project. Bids are expected to be open in <br /> August and the project will commence next summer. The overall length of the project is anticipated to be <br /> two to three months. <br /> Archer indicated he has also been in touch with the Water Patrol and that he will be contacting the LMCD <br /> at some point in the fuhue. Archer stated he can either get city approval tonight or come back later once <br /> the plans are more detailed. In addition,the residents will be able to sign up at any time on the website in <br /> order to get news releases and information on the project. <br /> Archer noted another bridge replacement is being planned on CSAH 146 near the intersection of Fox <br /> Street. That project will also be receiving federal dollars. Archer noted that project will be smaller than <br /> this project and have fewer impacts to the residents. <br /> Council Member Levang stated she happens to live at the bottom of Tonkawa Road where it intersects <br /> with Bayside and that last fall someone towing a very large boat missed turning left or right and landed in <br /> her driveway. Levang noted no one was hurt in that incident and that Hennepin County has now erected a <br /> sign with arrows showing that they have to turn. <br /> Levang stated she would like to ensure that that area is looked at carefully since it is not the first time that <br /> cars have missed that intersection and have landed in her driveway. Levang indicated there is a very <br /> steep landing on either side and that when someone is driving down Tonkawa, it is a very steep incline. <br /> Levang stated if someone is not familiar with the road,they can fail to turn and land in her driveway. In <br /> addition,the incline can become very slippery when it is raining or snowing and the visibility is not that <br /> good. Levang stated that area has the potential for accidents to happen if traffic is diverted that direction <br /> and that extra attention needs to be paid to that. <br /> Archer stated that will be part of the detour but that this project will not require any construction in that <br /> area. Archer indicated he will make sure additional signage is added as well as perhaps implementing <br /> temporary speed limits prior to the project commencing. <br /> Page 4 of 43 <br />