My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-2015 Council Packet
Orono
>
City Council
>
2015
>
03-09-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2015 3:18:37 PM
Creation date
4/2/2015 3:18:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� °� � <br /> O O CITY of �RONU ' <br /> A+ RES�I.UT10N UF THE CiTY COUNCIL <br /> �� G��' rvo. b � b 8 � <br /> �x'ESH��'� <br /> 4) Developer sha11 grant a 10' trail easement along Willow Drive in Lot 1 � <br /> Block 1 and Lot 1 Block 2 for future public trail construction by the CiTy. <br /> 5} Developer shall provide a Iandscaping plan meeting all of the <br /> requirernents of the R.PUD District, and addressing the elements of <br /> Conservation Design to the satisfaction of the City Council. Fina1 <br /> landscaping plans will be reviewed for cozLfomuty with the RPUD . <br /> standards. <br /> B. UEilities; Stor�nwater Management <br /> 1) Sanitary sewer mains shall be installed by the Developer per plan.s subject <br /> io approval by the City Engineer, A sewer easement shall be granted over <br /> the existing City sewer line in Lots 1 and 2, Block 1. <br /> 2) The City will own and maintain tha sanitary sewer mains within the <br /> development. Tl�e City will inspect these systems during their construction <br /> to ensure proper instaliation. Drainage and Utility Easements shall be <br /> gr�unied to flle City of Orono over all sewer utility Iines and facilities, <br /> including the rights of way necessary to maintain same. <br /> 3) Developer shall provide suitable evidence of Minnehaha Creek Watershed <br /> District (MCWD) approval of the stormwater management plan before <br /> final Development Plan Approval will be granted. The stormwater <br /> inana�zement systezn will be owned and maintained by a Homeownexs <br /> Association. <br /> C. Wetland Impacts <br /> 1) Applicant shall demonstrate to the satisfaction of the City Council that all <br /> requ.irements of the Minnehaha Creek Watershed District as administrator <br /> of the WCA regi.ilafiions on Orono's behalf, are complied with. <br /> D. Grading,Erosion Control <br /> I) Erosion control shall adhere to Best Management Practices in <br /> conformance wilh the City of Orono Surface Water Pollution Prevention <br /> Plazl (SWPPP), All erosion controls as zequired by the City and the <br /> MCWD shall be in place pxior to commencing excavation on the site. All <br /> sucl� erosion control measures sha11 be maintained in working order until <br /> the site is revegetated. <br /> Page8of13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.