Laserfiche WebLink
. � <br /> Council > <br /> V Exhibit D <br /> Date Application Received: 09/10/14 <br /> Date Application Considered as Complete: 09/10/14 <br /> 60-Day Review Period Ezpires: 11/9/14 <br /> To: Chair Leskinen and Planning Commission Members <br /> Jessica Loftus, City Administrator <br /> From: Mike Gaffron, Senior Plann <br /> Date: October 14, 2014 <br /> Subject: #14-3664, David Schmid&Angela Ciliberto, 3309 Crystal Bay Road <br /> - Site Plan Amendment-Variance & CUP <br /> - Public Hearing <br /> ----------------------------------------------------------------------------------- <br /> Zoning District: LR-1C, One Family Lakeshore Residential, 1/2 acre/100' <br /> Lot Area: 5,237 s.f. exclusive of traveled road (0.12 acre) <br /> Lot Width: 52' at Shoreline, 59' at 75' Setback Line <br /> Application Summary: Amend approved site plan to re-orient open parking space <br /> adjacent to Crystal Bay Road and replace retaining walls. <br /> Staff Recommendation: Planning Department Staff recommends approval of the <br /> request with conditions. <br /> List of Exhibits <br /> E�ibit A. Revised Survey &Proposed Site Plan <br /> Exhibit B. Originally Approved Survey& Site Plan <br /> E�ibit C. Resolution No. 6407 <br /> E�ibit D. Applicant Correspondence <br /> Exhibit E. Site Photos <br /> Exhibit F. Revised Hardcover Calculations (No change) <br /> E�ibit G. Property Owners List <br /> E�ibit H. Plat Map <br /> E�ibit I. Code Section 18-136 <br /> E�ibit J. PC Memo of 5/15/14 <br /> Background <br /> The applicants were granted variance and CUP approvals to construct a new residence via <br /> Resolution No. 6407 on June 9, 2014. While they have been issued permits and begun <br /> construction on the home based on the approved site plan, they are_�roposing a site plan <br /> revision regarding the front parking stall along Crystal Bay Road. That stall was approved <br /> in the location of the pre-existing detached garage, but is now being proposed as a parallel <br /> stall to the road, requiring an amendment of the approved site plan. <br /> The originally approved proposal included retention of the existing fieldstone-faced <br /> concrete retaining walls abutting Crystal Bay Road, removal of the underground garage, and <br /> construction of a new concrete rear retaining wall within the gazage footprint. That wall <br /> would have been approximately 8-1/2 feet high and would have required fencing or similar <br /> barrier at the top for safety purposes. <br />