My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-15-2015 Council Packet
Orono
>
City Council
>
1950-2024
>
2010-2019
>
2015
>
01-15-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:42:14 PM
Creation date
4/2/2015 10:36:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE • <br /> ORONO CITY COUNCIL MEETING <br /> Monday,December 8,2014 <br /> 6:30 o'clock p.m. <br /> PLANNING COMMISSION COMMENTS—KEVIN LANDGRAVER,REPRESENTATIVE <br /> Planning Comxnission Representative Kevin Landgraver stated he had nothing to report but would be <br /> available for questions. Landgraver stated he would like to thank Cynthia Bremer for her years of <br /> service. <br /> PUBLIC COMMENTS <br /> None <br /> PLANNING DEPARTMENT REPORT <br /> *9. COUNCII.LIAISON CALENDAR FOR PLANNING COMMMISSION <br /> Bremer moved,Levang seconded,to approve the schedule for Council attendance at Planning <br /> Commission meetings in 2015. VOTE: Ayes 5,Nays 0. <br /> 10. #14-3691 SOURCE LAND CAPITAL,LAKEVIEW PROPERTY,405 NORTH ARM <br /> DRIVE,PRELIMINARY PLAT WITH PRD OVERLAY—RESOLUTION NO.6474 <br /> Planning Consultant from Northwest Associated Consultants, Steve Grittman noted the City Council <br /> reviewed this item at their November 24 meeting. One of the items discussed at that time was a request <br /> by the applicant that the City consider a reducing of the storm water and drainage trunk fee. Grittman <br /> indicated the applicant has made some proposals as to how to calculate that fee and those proposals are <br /> included in the Council's packet. <br /> Grittman stated a second change from the previous plan that went before the City Council on November <br /> 24 relates to onsite septic systems. Staff inet with the applicant and their engineers to tweak their plan to <br /> ensure that the septic systems would be in compliance. The City Engineers feel those sites will meet <br /> regulations. The tested sites located north of Ms.Hager's properiy comply with all requirements for soil <br /> types, setbacks, slopes,and other regulations. An additional site located further from her home is likely <br /> but is subject to additional testing. Staff has met with the property owner and reviewed that information. <br /> Staff believes that the development plans have met the requirements for preliminary plat approval. <br /> Grittman indicated the Resolution before the City Council has been updated and that Staff is <br /> recommending approval of the resolution for preliminary plat for the Lakeview Golf Course. Grittman <br /> noted this application will eventually lead to final plat approval and a development agreement. <br /> Printup asked how the meeting with the property owner went a couple of days ago. <br /> Community Development Director Andrew Mack stated Staff reached out to the landowner and reviewed <br /> the site. Based on that review and those discussions, revisions were made to the septic site. The revisions <br /> have been reviewed by the City Engineer and septic inspector. Staff has looked at the alternative site that <br /> the applicant's designer suggested would be an appropriate primary site. That site would be positioned <br /> closer to the residence for that particular lot and would be located further away from Ms.Hager's <br /> property. Mack stated once the perc tests are completed next spring, Staff will be able to make a final <br /> determination on a change in location. At this time the other site will be reserved for an alternative site. <br /> Page 6 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.