Laserfiche WebLink
Revised Project Assessment Shoreline/Heritage Sanitary Sewer <br /> October 9, 1998 <br /> Page 2 <br /> Revised Assessment jnterest Rate <br /> An interest rate of S%per year was included it�the original assessment roll. We are recommet�ding <br /> a revised interest rate of 6.25%. This is the same interest rate that was presented at the Orono <br /> Orchards project public hearing. The proposed plan is to sell bonds in 1999 to cover the costs for <br /> the 1999 construction,Orona Orchards project and this project. The assessment interest rate for the <br /> 1997 projects, based on a 4.97% bond interest rate was 6.25% based on current trends, we are <br /> anticipating a stable bond market and simiIar interest rates for next yeaz. <br /> Requests for Proiect Excl�,j�ion <br /> Ttuee property owners have requested exclusion from the project. The assessment hearing notice <br /> indicated that pxaperty awners needed to request exclusion from the project at that time.Two written <br /> requests were r�ceived befare the assessment hearing and were li�ted in the assessment hearing staff <br /> mema. One additional resident requested exclusion at the assesstnent hearing. Subsequent <br /> investigation of the septic system proved the existence of a conf'ozming septie for this properly. No <br /> additional requests for exclusion have been received. <br /> The three p�roperty owners requesting exclusion are listed below: <br /> Daniel and Barbara Hoffman 1135 Heritage Lane <br /> Jorgen and Lucille Viltof� 1155 Heritage Lane <br /> C E and K Rusch � 1920 Shoreline Drive <br /> A coz�x�ection fee will be charged for these properties when a sewer connection is requested. <br /> The estimated annual City casts for debt service for a$15,500 assessment at a 5%bond interest rate <br /> for five properties will be $7,300. This includes the two vacant lots and the three properties <br /> excluded from the project. <br /> IVotices to the property owners describing the prepayment options available will be sent to the <br /> properties after adoption of the revised assessment roll. The assessment roll needs to be submitted <br /> to the County by December 1 st. <br /> COUNCIL ACTIOn'REQUESTED: <br /> Approval of the attached resolution adopting the revised assesstnent roll for the ShorelinelHeritage <br /> Sanitary Sewer Project. <br />