Laserfiche WebLink
/.�, � ��� <br /> / �` �`�'`� <br /> � O � �;, T <br /> � � ��'��t' o� �li�l� � <br /> Munici al Offices <br /> `���_ �; ,;,j ,� �'- �;; P <br /> ',�,� , � � ; <br /> ��'''�:; �' i . ;'� G-�%I Street Address: Mailing Address: <br /> ��� � ' � � � 2750 Kelley Parkway P.O. Box 66 <br /> `�kESH�¢�'�, <br /> �`��_� Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current O��ner of Address � `"� c� � �lc' �'�'� � �� �' � <br /> City Ordinance requires that onsite sewage treatinent systems in Orono be <br /> inspected on a periodic basis. The onsite sewa�e treatment system at the above <br /> address has been inspected and the followin�is known about the system. A <br /> sketch of the know°n components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Mana�er at 9�2-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brou�ht into compliance <br /> within 90 days. Failure to do so wi11 result in referral to the City Attomey for <br /> legal action. <br /> S3�stem Identified as 1\�on-Compliant <br /> Yes �Nn <br /> If yes, system must be brouaht into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes � <br /> -T <br /> No ✓ <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> � - � ��`-� . Tl�e tank(s) should be cleaned throuah the manhole and <br /> not through the inspection pipes, tlus allows for proper cleanina. <br /> Comments: <br /> ,.. <br /> � `' ^ <br /> � �� � �1� <br /> Inspec��`���1"`r �� �``"���`'� Date of Inspection �% 'C� � _ <br /> Telephone(9�2) 249-4600 • Fa� (9�2j 249-4616 <br />