My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00762 - retaining wall
Orono
>
Property Files
>
Street Address
>
G
>
Graham Hill Road
>
3340 Graham Hill Road - 05-117-23-11-0012
>
Permits/Inspections
>
2012-00762 - retaining wall
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:15:35 PM
Creation date
1/12/2017 3:10:20 PM
Metadata
Fields
Template:
x Address Old
House Number
3340
Street Name
Graham Hill
Street Type
Road
Address
3340 Graham Hill Rd
Document Type
Permits/Inspections
PIN
0511723110012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christine Mattson <br /> From: Christine Mattson <br /> Sent: Monday, August 13, 2012 11:53 AM <br /> To: 'lincoln@yardscapes.com' <br /> Cc: 'I.mccarty@mchsi.com'; Melanie Curtis <br /> Subject: 3340 Graham Hill Rd/Zoning Permit Application#2012-00762 <br /> Lincoln, <br /> Our City engineer has reviewed the proposed plans and has the following comments. Please address his <br /> comments and submit two updated survey's. <br /> If you have any questions, please don't hesitate to contact us. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelly Parkway Orono ; MN 55356 (physical addressJ <br /> PO Box 66 ' Crystal Bay `, MN ': 55323-0066 (mailing addressJ <br /> '� 952.249.4620 g 952.249.4616 <br /> � cmattson@ci.orono.mn.us � www.ci.orono.mn.us <br /> Summer Office Hours: (Monday, May 21 through Friday,August 31,2012) <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Monday,September 3, 2012 <br /> I have reviewed the proposed adjustment to the grading plan for 3340 Graham Hill Rd and have the following <br /> comments: <br /> • The plans to not show where the proposed pool equipment will be placed. Will there be another concrete pad <br /> for this equipment or will it be placed on the proposed pool deck? <br /> • It appears there is a walkway being proposed on the south side of the house, but it abruptly ends. I would infer <br /> they are planning a walkway either along the front of the house or one which extends to the driveway. This <br /> should be shown on the survey. <br /> • The proposed plan calls for various retaining walls throughout the back yard ranging in height from 2'-4'which <br /> do not require engineered plans. I will be doing an as-built site inspections and if the wall height exceeds 4' or if <br /> the tiered walls are not separated by 2x the height of the wall (measured from the back of the lower wall to the <br /> face of the upper wall),the applicant will be required to submit engineered plans signed by a professional <br /> registered engineer. <br /> Please contact me with any questions or concerns. <br /> Jesse Struve, PE <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (952) 249-4661 - Direct <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.