Laserfiche WebLink
' � that time the a swale on the east side of the property was not graded as proposed, therefore a final <br /> certificate of occupancy could not be issued due to this unresolved issue. City staff will be meeting with <br /> Matt from LDK on site on tomorrow(Wednesday,April 22"d) to discuss the swale requirement. Please <br /> note, according to the TCO, all exterior improvements must be completed by June 1, 2015. <br /> The City engineer's initial review of the survey noted the pink hashed area was wetland buffer, which <br /> was incorrect. Attached is a colored copy of Glendale Cove subdivision which shows the area in pink in <br /> wetland buffer. This pink area should shown on the survey as wetland buffer. The red hashed area on <br /> your survey may be lawn. The Minnehaha Creek Watershed District (MCWD) is copied on this email and <br /> may inspect the property and may notify you where the wetland buffer signage is to be located. Contact <br /> them directiy at 952-471-0590 to resolve the sign location issue. Once the signs are installed per the <br /> MCWD's requirement, please have the survey updated to show the correct wetland buffer area, signage <br /> location and swale once installed. <br /> If you have any questions, please don't hesitate to contact us. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway � Orono � MN � 55356 (physical addressJ <br /> PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ <br /> `� 952.249.4620 � � 952.249.4616 <br /> � cmattson@ci.orono.mn.us � � www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: Monday, May 25, 2015 <br /> 3 <br />