Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br /> <br />DATE: August 22, 2016 <br />ITEM NO: 4 <br />______________________________________________________________________________ <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Adam Edwards, P.E. JML Public Works Director/ <br />Title Public Works Director/City Engineer City Engineer’s Report <br />______ _______________________________________________________________________ <br />Item Description: 2801 Fox Street Sewer Extension <br />______________________________________________________________________________ <br /> <br />List of Exhibits <br />A- Location map showing potential sanitary sewer extension. <br />B- Cost Estimate <br /> <br />1. Purpose. The purpose of this action item is to gather Council approval on extending a sewer main to <br />service 2801 Fox Street and waiver of sewer connection fees. <br /> <br />2. Background. The homeowner at 2801 Fox Street, Mr. Richard Noland has requested the City extend <br />the municipal sewer to service his property. The property’s existing septic site has failed. The property is <br />in the Metropolitan Urban Service Area (MUSA) and the SAC fee has been paid. The nearest city sewer <br />main is a low pressure forcemain that extends to the intersection of Farview Lane and Old Crystal Bay <br />Road. <br /> <br />3. Sewer Connection Fee. Per the City Fee Schedule the sewer connection fee for the Farview Lane <br />Sewer is $10,650.00. The estimated cost for the sewer main extension is $15,250 (see Exhibit B). In <br />light of the cost to extend the main exceeding the connection fee cost the home owner requests the City <br />waive the Connection fee. <br /> <br />4. Funding. All cost associated with the construction of the sewer main and service line will be paid by <br />the resident. Upon completion and acceptance by the city, ongoing maintenance of the Sewer Main <br />portion of the project will be the City’s responsibility. <br /> <br />5. Impact on Cities Sewer Density Calculation. The property is included in the MUSA. Met Council <br />guidelines call for extensions to service area with a minimum of 3 connections per acre. This extension <br />would provide potential service to 1 connections of a 2 Acres lot or 0.17 connection per acre which is <br />well below the standard. <br /> <br />6. Way Forward. If the council approves of the project the follow steps would follow: <br />• Resident will acquire the necessary permits Permit process (MPCA, MCES, MCWD, Hennepin <br />County) <br />• The City will complete the Design review <br />• Resident will construct the sewer main and service line. <br />• City will inspect and then accept the sewer main. <br /> <br />7. Staff Recommendation. After consideration of the proposed project, it is my recommendation to <br />approve the sewer extension and to waive the connection fee. <br /> <br />COUNCIL ACTION REQUESTED: <br />Consider a motion to approve the sewer extension and whether to waive the connection fee.