My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-22-2016 Council Packet
Orono
>
City Council
>
2016
>
08-22-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 3:59:52 PM
Creation date
12/16/2016 3:53:42 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br /> <br />DATE: August 22, 2016 <br />ITEM NO: 4 <br />______________________________________________________________________________ <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Adam Edwards, P.E. JML Public Works Director/ <br />Title Public Works Director/City Engineer City Engineer’s Report <br />______ _______________________________________________________________________ <br />Item Description: 2801 Fox Street Sewer Extension <br />______________________________________________________________________________ <br /> <br />List of Exhibits <br />A- Location map showing potential sanitary sewer extension. <br />B- Cost Estimate <br /> <br />1. Purpose. The purpose of this action item is to gather Council approval on extending a sewer main to <br />service 2801 Fox Street and waiver of sewer connection fees. <br /> <br />2. Background. The homeowner at 2801 Fox Street, Mr. Richard Noland has requested the City extend <br />the municipal sewer to service his property. The property’s existing septic site has failed. The property is <br />in the Metropolitan Urban Service Area (MUSA) and the SAC fee has been paid. The nearest city sewer <br />main is a low pressure forcemain that extends to the intersection of Farview Lane and Old Crystal Bay <br />Road. <br /> <br />3. Sewer Connection Fee. Per the City Fee Schedule the sewer connection fee for the Farview Lane <br />Sewer is $10,650.00. The estimated cost for the sewer main extension is $15,250 (see Exhibit B). In <br />light of the cost to extend the main exceeding the connection fee cost the home owner requests the City <br />waive the Connection fee. <br /> <br />4. Funding. All cost associated with the construction of the sewer main and service line will be paid by <br />the resident. Upon completion and acceptance by the city, ongoing maintenance of the Sewer Main <br />portion of the project will be the City’s responsibility. <br /> <br />5. Impact on Cities Sewer Density Calculation. The property is included in the MUSA. Met Council <br />guidelines call for extensions to service area with a minimum of 3 connections per acre. This extension <br />would provide potential service to 1 connections of a 2 Acres lot or 0.17 connection per acre which is <br />well below the standard. <br /> <br />6. Way Forward. If the council approves of the project the follow steps would follow: <br />• Resident will acquire the necessary permits Permit process (MPCA, MCES, MCWD, Hennepin <br />County) <br />• The City will complete the Design review <br />• Resident will construct the sewer main and service line. <br />• City will inspect and then accept the sewer main. <br /> <br />7. Staff Recommendation. After consideration of the proposed project, it is my recommendation to <br />approve the sewer extension and to waive the connection fee. <br /> <br />COUNCIL ACTION REQUESTED: <br />Consider a motion to approve the sewer extension and whether to waive the connection fee.
The URL can be used to link to this page
Your browser does not support the video tag.