My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-2016 Council Packet
Orono
>
City Council
>
2016
>
07-11-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 10:10:24 AM
Creation date
12/16/2016 9:46:00 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
860
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mn/DOT SP 1006-28 SHEET 1 OF 1 SHEETS <br />State of Minnesota -Department of Transportation <br />WORK ORDER <br />MINOR EXTRA WORK <br />Contractor: Bituminous Roadways, Inc. Work Order No.: 6 <br />State Project No.: S.A.P. 152-103-003 <br />Address: 1520 Commerce Drive, Mendota Heights, MN 55120 Federal Project No.: -na- <br />Contract No.: -na- <br />Job Location: Watertown Road &Stubbs Bay Road, Orono, MN <br />In accordance with Standard Specifications 1103 and 1403 you are hereUy authorized and instructed to do the work described herein. <br />The original contract provides erosion and sediment control measures to be installed and maintained throughout the project area. <br />However, it has been determined by the Engineer that additional erosion and sediment control measures are needed at the south end of <br />Stubbs Bay Road to provide additional protection adjacent to Lake Minnetonka. Therefore, the contractor shall install and maintain a <br />temporary ditch check at the south end of Stubbs Bay Road, as directed by the Engineer. <br />The contractor shall provide all equipment, material, and labor to complete the work associated with various items described above <br />and listed below. <br />This extra work will be paid for with 100% Non-Participating Funds. <br />In accordance with Mn/DOT Specification 1403, the Engineer issues this Work Order to add the additional work items in accordance <br />with all applicable specifications and as directed by the project supervisor. <br />This work is not expected to become, or affect the Controlling operation. Contract time will not be altered as a result of this work <br />except as provided in Mn/DOT Specification 1806. <br />ESTIMATE OF COST <br />Increase: <br />Item No Item Unit Unit Price Quantity Amount <br />2573.512 Temporary Ditch Check Lump Sum $1,800.00 1.0 $1,800.00 <br />Total Increase this Work Order = $1,800.00 <br />Received By: Issued By: <br />c , ~ _"" w <br />Contractor Project Engineer/Super isor <br />Date I I J / I SO <br />Title ~ <br />Date *Approved <br />Assistant District Engineer <br />*Required for Work Orders that exceed $25,000.00 <br />Original to Engineer <br />Copy to Contractor Date <br />Copy to Construction and Innovative Contracting
The URL can be used to link to this page
Your browser does not support the video tag.