My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-2014 Council Minutes
Orono
>
City Council
>
Minutes
>
2010-2019
>
2014
>
09-08-2014 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2015 2:32:58 PM
Creation date
3/5/2015 2:32:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, September 8, 2014 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br /> Page 17 of 25 <br />(11. #14-3684 LAKEWEST, LLC, ON BEHALF OF HOWARD EISINGER TRUST, 3245 <br />WAYZATA BOULEVARD – SKETCH PLAN REVIEW, Continued) <br /> <br />Gaffron stated approximately three to four years ago, the City improved its 2008-2030 Comprehensive <br />Plan. One of the City’s requirements was to meet Metropolitan Council’s goals for density and, as a <br />result, certain properties generally along Highway 12 and Navarre were re-guided in the Comprehensive <br />Plan to allow for higher density. <br /> <br />The property in question is the Eisinger property, which is at the very west end of the Highway 12 <br />corridor area. A portion of the property has a former sanitary landfill, which leaves part of the property <br />unusable for a number of things but that it is potentially usable for some uses that do not require <br />foundations. The property generally has five acres that could be used for a housing development. <br />Gaffron stated this land was re-guided in the Comprehensive Plan to allow for 10 to 15 units per acre, <br />which would require City sewer and water. Gaffron indicated the property was re-guided for higher <br />density with some specific language about how that higher density should occur. The Comprehensive <br />Plan suggested that there should be two buildings, but no more than two, and that they should not be more <br />than 42,000 square feet. The Comprehensive Plan also contemplated a multi-family dwelling situation. <br /> <br />Gaffron stated he would like the applicants to make a presentation on their proposal. <br /> <br />Donald Jensen, Land Development Director of Lakewest, LLC, stated they have met with Staff on this <br />property and have discussed various options. Jensen stated when they attempted to work with the two <br />building concept as called out in the Comprehensive Plan, it was determined that it would not be as <br />economically viable for a number of reasons. Jensen stated the 42,000 square feet buildings created <br />certain limitations on the layout of the development and that the Comprehensive Plan is basically silent as <br />to where the garages would go, whether there would be detached or underground parking, and whether <br />the square footage of the garages is included in the 42,000 square feet. <br /> <br />Jensen stated they have looked at what the marketplace is comfortable renting for square footage and that <br />they determined a majority of the people are looking for a floor plan that runs between 1,200 and 1,600 <br />square feet per floor. Jensen stated if they are limited to a 42,000 square foot building, individual units <br />likely would be approximately 1,500 square feet. In addition, space for elevators and hallways would <br />need to be allocated, which would lower the floor space to approximately 1,200 square feet. <br /> <br />Jensen stated they have worked with Staff on a number of different options and have come up with a <br />design for detached units that would consist of slightly varying footprints. In total 26 units are being <br />proposed. <br /> <br />Jensen noted they originally proposed access to the site from the west side, which has since been revised, <br />but access is now being proposed near the current driveway that serves the existing home. For fire <br />department purposes, Jensen stated they are considering the possibility of using the driveway for the old <br />construction landfill portion as access for emergency vehicles, which would leave the opportunity for <br />water quality to be in the far west, south, and southeast portions of the site. <br /> <br />Jensen noted some construction may be allowed on the old landfill site as long as the proper permits are <br />obtained through the PCA and that they have just started to do some land exploration. Jensen stated one <br />possibility would be a recreation area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.