Laserfiche WebLink
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON NOVEMBER 25, 1996 <br />• ( #1B - County Road 15 Orono Lane to Wayzata Border - Continued) <br />Goetten indicated when the plan was originally reviewed, the clear zone was discussed <br />and a variance secured. She asked why this was not required here. Polaczyk noted there <br />were two types of clear zones, one being rural and one suburban. A 20' zone is required <br />in the suburban where berms, curb, and gutter are required. In the rural as is the case in <br />this particular area, a 30' clear zone is required. The suburban zone is applied elsewhere <br />on this roadway. Goetten stated that it had originally been indicated the trees would be <br />lost due to the wetlands and questioned what the benefit was. <br />Kelley asked if the roadway was being moved at this location to the north. Guy Nolan of <br />the design team said it would move 5 meters (about 15') from the edge of the bituminous <br />to the other edge. Polaczyk indicated this movement would also reduce the impact on <br />the properties on the south side. <br />Goetten said she was disturbed, after having asked for this design several times, to be <br />seeing it for the first time at this meeting. Goetten felt it would be imprudent to make a <br />decision without reviewing the actual design. Jabbour suggested hearing the information <br />presented and tabling any decision to the next Council meeting. Polaczyk reiterated the <br />movement of the road was due to the recommendation of the geotechnical consultant. <br />Kelley asked if the movement of the road to the north was a result of the poor soils. <br />• Polaczyk said this was a partial reason. Kelley asked how deep these materials are <br />located. Nolan said the depth is 2 meters on the north to 3 -1/2 meters on the south, <br />which is 6' to 10 -12'. Kelley asked if the materials would be excavated. Polaczyk said <br />the materials would be floated and then surcharged. Surcharging is adding a fabric <br />material and weighting it down which compresses the soils. Then after a time duration, <br />the surcharge is removed and the road is built to proposed elevations. <br />• <br />Nolan indicated the time length for the surcharge to be about 6 months. It would be <br />completed in two stages. Two lanes of traffic would be moved to the south by using the <br />existing shoulder and one lane during the time the north side is being surcharged. This <br />would allow the roadway to remain open. <br />Goetten said it was her understanding that the roadway would move 12' to the north. <br />Then the distance changed to 20'. Polaczyk said the amount is now 16'. Nolan explained <br />that the alignment is shifted 10' to the north and the left turn lane shifts it slightly more. <br />3 <br />