My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-1996 Council Minutes
Orono
>
City Council
>
Minutes
>
1990-1999
>
1996
>
09-09-1996 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2012 4:18:41 PM
Creation date
12/28/2012 4:18:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON SEPTEMBER 9, 1996 <br />( 97 - #2161 James and Melissa Easley - Continued) <br />Callahan inquired about the "office" over the garage. Easley said it would presently be • <br />just a space, not an office per se. When the new house is built, it would be used as a <br />living space during construction. He said it was his understanding that a temporary <br />permit could be obtained. It was not their intention to have any rental space but possibly <br />for use for parents in the future for short-term stays. He was asked if plumbing would be <br />included. Easley said it would eventually be added. Jabbour noted that this could not be <br />accomplished under the present ordinance. Gaffron said a CUP could be applied for use <br />as a guest apartment. That would require a building plan with a home attached to it and <br />plumbing installed first. Gaffron said such a plan could be worked with, but if the old <br />house was retained and an apartment built over the garage, this would create a problem. <br />Jabbour noted that the code is so laid out to eliminate substandard properties being <br />subdivided and requires double the normal lot area for a guest house. Goetten <br />commented that there was such a mother -in -law apartment now in the Casco Point area. <br />Callahan noted that since the space would presently be vacant, he advised the applicants <br />to work carefully with the Staff with their future plans for modification. <br />Kelley informed the applicant that with such a large structure, the applicants may give up <br />a larger new home. Kelley asked that any overage on the new garage be offset on the <br />new house in order for the ordinance be met. Easley said the original plan was for a <br />smaller structure with an outside staircase. Kelley said he wanted to make them aware of <br />possible future problems. Callahan noted that the Council will look at the entire project • <br />together when the new home is proposed. Easley inquired if the stairwell was moved to <br />the outside reducing the structure, how this would affect the hardcover. Gaffron said it <br />would be included in lot coverage if the top of the railing exceeds 6', which a portion <br />probably would. Callahan advised the applicants to do their best to keep problems to a <br />minimum. <br />Kelley asked the distance between the east side of the garage and the east lot line. <br />Gaffron said it would be about 15'. Kelley cautioned the applicants regarding the need to <br />get trucks in between the garage and the maple trees when building a new home. <br />Goetten moved, Jabbour seconded, to approve Resolution #3759 for lot coverage, <br />hardcover, street, side, and height variances for a new garage to replace the existing <br />garage with the conditions as noted in the resolution. Kelley noted that if the house is <br />eventually proposed for replacement, he would expect that the structural coverage be <br />brought into compliance with the ordinance requirement as part of the future variance <br />approval. Callahan asked the applicants to work with Staff regarding any minor <br />differences found to be required in building the new garage. Vote: Ayes 4, Nays 0. <br />is <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.