My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-08-1997 Council Minutes
Orono
>
City Council
>
1997
>
12-08-1997 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2012 4:06:42 PM
Creation date
12/28/2012 4:06:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON DECEMBERS, 1997 <br />( #24 Authorization To Disburse City Funds For Claims Received - Continued) <br />Kelley moved, Peterson seconded, to authorize the City Treasurer to disburse City funds <br />in payment of claims received for the December 22nd Council Meeting, which has been <br />canceled, and that such claims be presented for formal approval at the January 12, 1998 <br />Council Meeting. Vote: Ayes 5, Nays 0. <br />( * #25) APPOINT AUDITOR FOR FISCAL YEAR 1997 <br />Goetten moved, Peterson seconded, to approve the appointment of the audit firm of <br />Malloy, Montague, Karnowski, Radosevich & Co., P.A. to perform the required audits <br />for the 1997 fiscal year records at an estimated cost of $18,650, plus direct expenses. <br />Vote: Ayes 5, Nays 0. <br />( #26) CANOPY FOR PUBLIC WORKS BUILDING <br />Moorse said the canopy has been re- engineered. The original concept was shown. <br />Jabbour was informed that the original architectural drawing was done by Bonestroo. <br />Gappa reviewed the changes to the structure. <br />Goetten asked why the cost was so high. Gappa said it was due to the roof structure. • <br />Moorse said the low bid was from Flag Builders for $19,480. <br />Jabbour asked if the construction would be done this year. Gappa said the majority of <br />the structure would be erected this year, namely the roof structure and columns. The <br />finishing work would occur in the spring. <br />Jabbour inquired of the foundation. Gappa said the type of footings was changed to a <br />drilled type, which reduced the cost. Goetten said the cost is still expensive. Gappa said <br />the original low bid was over $30,000. Changes included footings and removal of brick. <br />Jabbour noted that the door was located on the wrong side of the building for snow and <br />ice accumulation. Gappa said that fact was reviewed but change in door location was <br />not practical with the layout of the interior. <br />Kelley moved, Peterson seconded, to award the Public Works Building entrance canopy <br />project to the low bidder, Flag Builders, in the amount of $19,480; that the project <br />contract costs are to be paid from the Building Outlay Fund; and that the 1997 budget <br />appropriation is amended in the ainount of $19,480. <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.